Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09291
Well Classification: CBM Status: PR - 5/24/2007
Well Name/No:HILL RANCH #26-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/24/2007
FacilityID:290742LocationID:309247
County:LAS ANIMAS #071Location:SESW 26 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7926 ft.
Basin:RATON BASIN  
Planned Location:305FSL  1492 FWLLat/Long: 37.048790 / -104.860890Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.048809 / -104.860942Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 4/13/2007             Measured TD: 2635 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 4/13/2007
Wellbore Permit
Permit #:20071993 Expiration Date:5/23/2008
Proposed Depth/Form:2481 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1836 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 320, Top: 0 ft., Bottom: 1836 ft.

Wellbore Completed
Completion Date:8/25/2007
Spud Date:8/23/2007Spud Date Is:ACTUAL
Measured TD:2635 ft.Measured PB depth:2553 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR/DUAL IND/COMP DENSITY NEUTRON W/CALIPER, LTD W/GR, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 87, Top: 0 ft., Bottom: 46 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 496 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 0 ft., Bottom: 496 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2599 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 2599 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1852 ft.NN
VERMEJO COAL1966 ft.2353 ft.NN
TRINIDAD2353 ft.2635 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 1/7/2008                  Interval Top: 1237 ft.    Interval Bottom: 2242 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:1/4/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/25/2007
Treatment Summary:ACIDIZED W/3000 GAL 15% HCI ACID. FRAC W/167,093 GAL 20# DELTA 140 W/SANDWEDGE OS CARRYING 20,500# 16/30 AND 173,578# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2339 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/7/2008Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 411
BBLS_OIL 0
BTU_GAS 1004
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 12
GRAVITY_OIL 1
MCF_GAS 0
TUBING_PRESS 5
Perforation Data:
Interval Top:1237 ft.# Of Holes:64
Interval Bottom:2242 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)22869
GOR
GOR DeterminationMCFE
Average BOE per Day10.803
Average MCFE per Day62.656

 Federal Financial Assurance  i 

 Tribal Well  i No