Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09285
Well Classification: CBM Status: SI - 2/1/2024
Well Name/No:APACHE CANYON #30-05-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date2/1/2024
FacilityID:290517LocationID:309241
County:LAS ANIMAS #071Location:SWNW 30 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8040 ft.
Planned Location:2192FNL  1007 FWLLat/Long: 37.056510 / -104.934200Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.056480 / -104.934220Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 2/1/2024             Measured TD: 2485 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 2/1/2024
Wellbore Permit
Permit #:20071784 Expiration Date:5/7/2008
Proposed Depth/Form:2250 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1545 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 270, Top: 0 ft., Bottom: 1545 ft.

Wellbore Completed
Completion Date:7/18/2007
Spud Date:7/16/2007Spud Date Is:ACTUAL
Measured TD:2485 ft.Measured PB depth:2408 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND W/GR&COMP DENSITY NEUTRON W/CALIPER
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 81, Top: 0 ft., Bottom: 46 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.375 in., Size: 8.625 in., Top: 0 ft., Depth: 496 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 257, Top: 0 ft., Bottom: 496 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2454 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 2454 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1753 ft.NN
VERMEJO COAL1876 ft.2219 ft.NN
TRINIDAD2219 ft.2472 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 2/1/2024                  Interval Top: 718 ft.    Interval Bottom: 2130 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/6/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/17/2007
Treatment Summary:ACIDIZED Q/3675 GAL 15% HCL ACID. FRAC W/216,017 GAL 20# DELTA 140 W/SANDWEDGE OS CARRYING 26,100# 16/30 BRADY SAND AND 439,458# 12/20 ARIZONA SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2237 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/8/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 147
BBLS_OIL 0
BTU_GAS 1002
GRAVITY_OIL 1
MCF_GAS 6
Perforation Data:
Interval Top:718 ft.# Of Holes:108
Interval Bottom:2130 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 4/2/2007

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/18/2007
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
01/31/2024
Low ProducingYProduction Period
05/2024 - 04/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No