Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09280
Well Classification: CBM Status: SI - 5/1/2023
Well Name/No:APACHE CANYON #8-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2023
FacilityID:290522LocationID:309236
County:LAS ANIMAS #071Location:NWSW 8 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7597 ft.
Planned Location:1861FSL  851 FWLLat/Long: 37.096620 / -104.917380Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.096620 / -104.917370Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 5/1/2023             Measured TD: 2177 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 5/1/2023
Wellbore Permit
Permit #:20071780 Expiration Date:5/7/2008
Proposed Depth/Form:2125 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1397 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 0 ft., Bottom: 1397 ft.

Wellbore Completed
Completion Date:7/12/2007
Spud Date:7/10/2007Spud Date Is:ACTUAL
Measured TD:2177 ft.Measured PB depth:2105 ft.
True Vertical TD:True Vertical PB depth:
Log Types:ALREADY SUBMITTED - DIL, CD/CN/ CBL
Log Types:DUAL INDUCTION COMP DENSITY NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 48 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 78, Top: 0 ft., Bottom: 48 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.375 in., Size: 8.625 in., Top: 0 ft., Depth: 497 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 227, Top: 0 ft., Bottom: 497 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2149 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 646 ft., Bottom: 2149 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 646 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 95, Top: 0 ft., Bottom: 646 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1529 ft.NN
VERMEJO COAL1529 ft.1896 ft.NN
TRINIDAD1896 ft.2177 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 5/1/2023                  Interval Top: 556 ft.    Interval Bottom: 1857 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:10/5/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/10/2007
Treatment Summary:ACIDIZED W/3750 GALS 15% HCI ACID. FRAC'D W/218,185 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 12,800# 16/30 AND 443,284# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1966 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/7/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 86
BTU_GAS 1010
CALC_BBLS_H2O 86
CASING_PRESS 6
GRAVITY_OIL 1
TUBING_PRESS 3
Perforation Data:
Interval Top:556 ft.# Of Holes:112
Interval Bottom:1857 ft.Hole Size:0.45 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
04/30/2023
Low ProducingYProduction Period
02/2024 - 01/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2024 - January 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No