Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09275
Well Classification: CBM Status: PR - 4/1/2025
Well Name/No:HILL RANCH #16-09VX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2025
FacilityID:290491LocationID:333490
County:LAS ANIMAS #071Location:NESE 16 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7824 ft.
Basin:RATON BASIN  
Planned Location:3354FNL  521 FELLat/Long: 36.995290 / -104.885810Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 36.995306 / -104.885848Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 4/1/2025             Measured TD: 2335 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 4/1/2025
Wellbore Permit
Permit #:20071994 Expiration Date:5/7/2008
Proposed Depth/Form:2325 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1633 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 1633 ft.

Wellbore Completed
Completion Date:4/16/2007
Spud Date:4/10/2007Spud Date Is:ACTUAL
Measured TD:2335 ft.Measured PB depth:2256 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUCTION; COMP DENSITY NEUTRON; CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: , Depth: 49 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: 96, Top: 0 ft., Bottom: 49 ft., Determination Method: CBL
Casing:String Type: SURF, Hole Size: , Size: 8.625 in., Top: , Depth: 483 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 274, Top: 0 ft., Bottom: 441 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2303 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 100 ft., Bottom: 2303 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1691 ft.NN
VERMEJO COAL1788 ft.2064 ft.NN
TRINIDAD2064 ft.2323 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  PR - 4/1/2025                  Interval Top: 1790 ft.    Interval Bottom: 2003 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:7/7/2007Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/9/2007
Treatment Summary:ACIDIZED W/1500 GALS 15% HCI ACID. FRAC W/79,791 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 18,300# 16/30 AND 145,383# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2133 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/10/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 87
BBLS_OIL 0
BTU_GAS 1001
CALC_BBLS_H2O 87
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
MCF_GAS 0
TUBING_PRESS 1
Perforation Data:
Interval Top:1790 ft.# Of Holes:36
Interval Bottom:2003 ft.Hole Size:0.45 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)2581
GOR
GOR DeterminationMCFE
Average BOE per Day1.212
Average MCFE per Day7.029

 Federal Financial Assurance  i 

 Tribal Well  i No