Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09239
Well Classification: CBM Status: PR - 2/7/2018
Well Name/No:GOLDEN EAGLE #30-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/7/2018
FacilityID:290086LocationID:309203
County:LAS ANIMAS #071Location:NWSW 30 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7888 ft.
Planned Location:1704FSL  734 FWLLat/Long: 37.139880 / -104.935220Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.139899 / -104.935228Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/31/2017
End Date: 1/2/2018
Reported: 1/26/2018
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/7/2018             Measured TD: 2403 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/7/2018
Wellbore Permit
Permit #:20071127 Expiration Date:4/9/2008
Proposed Depth/Form:2375 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1658 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 1658 ft.

Wellbore Completed
Completion Date:1/31/2008
Spud Date:1/28/2008Spud Date Is:ACTUAL
Measured TD:2403 ft.Measured PB depth:2325 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, DIL, CD/NL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 98, Top: 0 ft., Bottom: 46 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 496 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 233, Top: 0 ft., Bottom: 496 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2373 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 307, Top: 396 ft., Bottom: 2373 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1728 ft.NN
RATON SAND1728 ft.1805 ft.NN
VERMEJO COAL1805 ft.2173 ft.NN
TRINIDAD2173 ft.2403 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/7/2018                  Interval Top: 638 ft.    Interval Bottom: 2168 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:3/27/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/31/2017Treatment End Date:1/2/2018
Treatment Summary:Perforated eight Vermejo Coal intervals listed by stage with 4 SPF and 120 degree phasing and fraced eight Vermejo Coal intervals including Stage 1 - 2,160' - 68', Stage 2 - 2,130' - 34', Stage 3 - 2,098' - 00' and 2,108' - 10', Stage 4 - 2,060' - 63' and 2,074' - 2,078', Stage 5 - 1,949' - 60', Stage 6 - 1,891' - 94' and 1,898' - 01', Stage 7 - 1,840' - 48' and Stage 8 - 1,623' - 26' and 1,637' - 41' (net - 55' or 220 holes with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac.. A total of 1,500 gallons 15% HCl, 157,987 gallons of produced water, 157,003 lbs of 20/40 Premium White Sand and 569,743 scf N2 were pumped. Stage 3 was skipped due to backside pressure. Stage 7 was skipped as the isolation tool could not get back to depth. NCS tool left in the hole with top at 1,884' GL. Removal of tool will be attempted at a later date. Perforated eight Raton Coal intervals listed by stage with 4 SPF and 120 degree phasing and fraced the eight Raton Coal intervals including Stage 9 - 1,086' - 93', Stage 10 - 1,008' - 15', Stage 11 - 982' - 988', Stage 12 - 982' - 88', Stage 13 - 850' - 857', Stage 14 - 700' - 709', Stage 15 - 674' - 682' and Stage 16 - 638' - 641' amd 652' - 654' (net - 54' or 216 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 1,000 gallon of 15% HCl, 147,991 gallons of produced water, 218,927 lbs of 20/40 mesh Premium White Sand and 708,702 scf N2 were pumped. Stage 9 was prematurely shutdown due to an erroneous Halliburton pressure transducer indicating backside pressure was increasing rapidly. The pressure transducer was subsequently found to be wrong. Stage 11 and 13 were skipped due to backside pressure increasing on previous stages. The CTU was rigged down and moved to the next location. Well was cleaned out to top of tool at 1,884'. LD 2-7/8" tubing and returned to production as a commingled Raton - Vermejo coal well flowing up casing.
Total fluid used in treatment (bbls):7344Max pressure during treatment (psi):2939
Total gas used in treatment (mcf):1278445Fluid density (lbs/gal):8.35
Type Of gas:NITROGENNumber Of staged intervals:16
Total acid used in treatment (bbls):59Min frac gradient (psi/ft):0.47
Recycled water used in treatment (bbls):7285Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):375930Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:1/23/2014Treatment End Date:2/19/2014
Treatment Summary:XTO squeezed off only the perfs fr/506'-545' in this formation on 02/19/2014 with 119 sx Type B cmt. A Sbsq Form 4 has also been filed.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:2/24/2008
Treatment Summary:ACIDIZED W/7000 GALS 15% HCL ACID. FRAC'D W/348,431 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 49,700# 16/30 BRADY SAND AND 782,764# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:0 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/21/2018Test Method:Flowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 85
BBLS_OIL 0
BTU_GAS 1004
CALC_BBLS_H2O 85
CALC_BBLS_OIL 24
CALC_MCF_GAS 93
CASING_PRESS 5
GRAVITY_OIL 1
MCF_GAS 93
TUBING_PRESS 3
Perforation Data:
Interval Top:638 ft.# Of Holes:436
Interval Bottom:2168 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)17717
GOR
GOR DeterminationMCFE
Average BOE per Day8.369
Average MCFE per Day48.535

 Federal Financial Assurance  i 

 Tribal Well  i No