Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09237
Well Classification: CBM Status: PR - 2/7/2018
Well Name/No:NEW ELK #25-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/7/2018
FacilityID:290088LocationID:309201
County:LAS ANIMAS #071Location:SESE 25 33S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:7943 ft.
Planned Location:892FSL  760 FELLat/Long: 37.137440 / -104.940340Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.137443 / -104.940352Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/26/2017
End Date: 12/28/2017
Reported: 1/26/2018
Days to report: 29
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/7/2018             Measured TD: 2350 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/7/2018
Wellbore Permit
Permit #:20071125 Expiration Date:4/9/2008
Proposed Depth/Form:2350 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1633 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 1633 ft.

Wellbore Completed
Completion Date:2/4/2008
Spud Date:2/1/2008Spud Date Is:ACTUAL
Measured TD:2350 ft.Measured PB depth:2276 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DENSITY NEUTRON/GR/CBL/CCL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 164, Top: 0 ft., Bottom: 50 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 452 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 210, Top: 0 ft., Bottom: 460 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2323 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 0 ft., Bottom: 2350 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1774 ft.NN
VERMEJO COAL1774 ft.2140 ft.NN
TRINIDAD2140 ft.2350 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/7/2018                  Interval Top: 469 ft.    Interval Bottom: 2139 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:4/19/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/26/2017Treatment End Date:12/28/2017
Treatment Summary:Perforated five Vermejo Coal listed by stage with 4 SPF and 120 degree phasing and fraced the five Vermejo Coal intervals including Stage 1 - 2,113'-18' and 2,132' - 39', Stage 2 - 2,024' - 28', Stage 3 - 1,926' - 30', Stage 4 - 1,850' - 55' and Stage 5 - 1,590' - 92' and 1,600' - 1,606' (net - 31' or 124 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 1,500 gallons 15% HCl, 110,922 gallons of produced water, 113,938 lbs of 20/40 mesh Premium White Sand and 892,756 scf N2 were pumped. Stage 2 screened out during 1.0 ppg sand concentration downhole. Moved uphole to next Stage 3. Perforated eight Raton Coal intervals including Stage 6 - 1,288' - 90' and 1,299' - 01', Stage 7 - 968' - 74' and 984' - 91', Stage 8 - 865' - 69', Stage 9 - 834' - 39', Stage 10 - 770' - 74', Stage 11 - 709' - 14', Stage 12 - 680' - 87' and Stage 13 - 646' - 56' (net - 52' or 208 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 2,000 gallons of 15% HCl, 251,763 gallons of produced water, 254,987 lbs of 20/40 mesh Premium White Sand and 1,116,483 scf N2 were pumped. The CTU was rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton-Vermejo Coal well.
Total fluid used in treatment (bbls):7861Max pressure during treatment (psi):3761
Total gas used in treatment (mcf):2009239Fluid density (lbs/gal):8.35
Type Of gas:NITROGENNumber Of staged intervals:13
Total acid used in treatment (bbls):83Min frac gradient (psi/ft):0.50
Recycled water used in treatment (bbls):7778Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):368925Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:3/5/2008
Treatment Summary:ACIDIZED W/4000 GALS 15% HCI ACID. FRACD W/247,043 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 33,000# 16/30 ARIZONA SAND & 564,966# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2187 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/6/2018Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 194
BBLS_OIL 0
BTU_GAS 932
CALC_BBLS_H2O 194
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1
CASING_PRESS 2
GRAVITY_OIL 1
MCF_GAS 1
TUBING_PRESS 6
Perforation Data:
Interval Top:469 ft.# Of Holes:332
Interval Bottom:2139 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)17817
GOR
GOR DeterminationMCFE
Average BOE per Day8.415
Average MCFE per Day48.793

 Federal Financial Assurance  i 

 Tribal Well  i No