Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09235
Well Classification: CBM Status: PR - 12/10/2008
Well Name/No:NEW ELK #36-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/10/2008
FacilityID:290090LocationID:309199
County:LAS ANIMAS #071Location:SWNE 36 33S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8051 ft.
Planned Location:2427FNL  1920 FELLat/Long: 37.128300 / -104.944310Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.128291 / -104.944308Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 12/10/2008             Measured TD: 2410 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 12/10/2008
Wellbore Permit
Permit #:20071124 Expiration Date:4/9/2008
Proposed Depth/Form:2300 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1631 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 1631 ft.

Wellbore Completed
Completion Date:2/10/2008
Spud Date:2/8/2008Spud Date Is:ACTUAL
Measured TD:2410 ft.Measured PB depth:2338 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUC/COMP DENSITY/NEUTRON W/GR & CBL W/GR
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 49 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 55, Top: 0 ft., Bottom: 49 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 451 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 234, Top: 0 ft., Bottom: 451 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2385 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 333, Top: 56 ft., Bottom: 2385 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1791 ft.NN
VERMEJO COAL1791 ft.2132 ft.NN
TRINIDAD2132 ft.2410 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 12/10/2008                Interval Top: 481 ft.    Interval Bottom: 2108 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:4/14/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/6/2008
Treatment Summary:ACIDIZED W/4,000 GALS 15% HCL. FRAC'D W/246,138 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 47,200 15/30 ARIZONA SAND AND 625,785# 12/20 ARIZONA SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2206 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/14/2008Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 184
BTU_GAS 1011
CALC_BBLS_H2O 184
CASING_PRESS 7
TUBING_PRESS 3
Perforation Data:
Interval Top:481 ft.# Of Holes:151
Interval Bottom:2108 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)28708
GOR
GOR DeterminationMCFE
Average BOE per Day13.562
Average MCFE per Day78.701

 Federal Financial Assurance  i 

 Tribal Well  i No