|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 6/17/2009 Measured TD: 1930 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 6/17/2009 | | Wellbore Permit | | | Permit #: | 20070314 | Expiration Date: | 3/11/2008 | | Proposed Depth/Form: | 1600 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 878 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 160, Top: 0 ft., Bottom: 878 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/26/2007 | | Spud Date: | 4/24/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 1930 ft. | Measured PB depth: | 1798 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DUAL INDUC.,COMP.DENSITY NEUTRON W/GR & CALIP | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 49 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 87, Top: 0 ft., Bottom: 49 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 496 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 233, Top: 0 ft., Bottom: 496 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1843 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 336, Top: 0 ft., Bottom: 1843 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 990 ft. | N | N | | VERMEJO COAL | 1060 ft. | 1446 ft. | N | N | | TRINIDAD | 1446 ft. | 1931 ft. | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 6/17/2009 Interval Top: 522 ft. Interval Bottom: 1336 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 7/6/2007 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/2/2007 | | Treatment Summary: | ACIDIZED W/ 2000 GALS 15% HCL ACID FRAC'D W/ 123,706 GALS 20# DELTA 140 W/ SUPERSET & SANDWEDGE OS CARRYING 12,100# 16/30 AND 249,124# 12/20 BRADY SAND AND 20,000# 12/20 SLC SAND |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1472 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/9/2007 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 110 | | BBLS_OIL | 0 | | BTU_GAS | 992 | | CALC_BBLS_H2O | 110 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 8 | | GRAVITY_OIL | 1 | | MCF_GAS | 0 | | TUBING_PRESS | 3 |
| | Perforation Data: | | Interval Top: | 522 ft. | # Of Holes: | 80 | | Interval Bottom: | 1336 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 12978 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 6.128 |
| Average MCFE per Day | 35.566 |
| Federal Financial Assurance | i | |
|
|