Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09135
Well Classification: CBM Status: PR - 10/31/2007
Well Name/No:NEW ELK #36-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/31/2007
FacilityID:288589LocationID:309138
County:LAS ANIMAS #071Location:NENW 36 33S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:7588 ft.
Planned Location:368FNL  1876 FWLLat/Long: 37.133920 / -104.949410Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.133955 / -104.949542Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/31/2007             Measured TD: 1900 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/31/2007
Wellbore Permit
Permit #:20065944 Expiration Date:12/26/2007
Proposed Depth/Form:1825 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1128 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 1128 ft.

Wellbore Completed
Completion Date:3/16/2007
Spud Date:3/13/2007Spud Date Is:ACTUAL
Measured TD:1900 ft.Measured PB depth:1838 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMBO DUAL IND.,COMP.DENSITY NEUTRON W/GR&CALIPER ; CDNL ; CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 49 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 74, Top: 0 ft., Bottom: 49 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 688 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 337, Top: 0 ft., Bottom: 688 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1838 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 75 ft., Bottom: 1838 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1188 ft.NN
VERMEJO COAL1280 ft.1620 ft.NN
TRINIDAD1620 ft.1900 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/1/2012                  Interval Top: 1157 ft.    Interval Bottom: 1582 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:10/18/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/2/2007
Treatment Summary:ACIDIZED W/750 GALS 15% HCL ACID. FRAC'D W/105,922 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 11,500# 16/30 AND 20,200# 12/20 SLC SAND AND 237,873# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1683 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/21/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 73
BTU_GAS 1007
CALC_BBLS_H2O 73
CALC_MCF_GAS 1045
CASING_PRESS 16
MCF_GAS 1045
TUBING_PRESS 2
Perforation Data:
Interval Top:1157 ft.# Of Holes:73
Interval Bottom:1582 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)45417
GOR
GOR DeterminationMCFE
Average BOE per Day21.443
Average MCFE per Day124.394

 Federal Financial Assurance  i 

 Tribal Well  i No