Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09132
Well Classification: CBM Status: PR - 10/1/2025
Well Name/No:APACHE CANYON #5-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2025
FacilityID:288592LocationID:309135
County:LAS ANIMAS #071Location:NESW 5 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7490 ft.
Basin:RATON BASIN  
Planned Location:2517FSL  2402 FWLLat/Long: 37.112910 / -104.912070Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.112905 / -104.912068Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/1/2025             Measured TD: 2115 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/1/2025
Wellbore Permit
Permit #:20065935 Expiration Date:12/26/2007
Proposed Depth/Form:2000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1275 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 230, Top: 0 ft., Bottom: 1275 ft.

Wellbore Completed
Completion Date:7/7/2007
Spud Date:7/5/2007Spud Date Is:ACTUAL
Measured TD:2115 ft.Measured PB depth:2048 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 47 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 81, Top: 0 ft., Bottom: 47 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.375 in., Size: 8.625 in., Top: 0 ft., Depth: 496 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 382, Top: 0 ft., Bottom: 496 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 2094 ft., Depth: 330 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 227 ft., Bottom: 2094 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1341 ft.NN
VERMEJO COAL1432 ft.1816 ft.NN
TRINIDAD1816 ft.2109 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 10/1/2025                 Interval Top: 572 ft.    Interval Bottom: 1797 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/13/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/1/2007
Treatment Summary:ACIDIZED W/3500 GALS 15% HCI ACID. FRAC'D W/163,381 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 26.200# 16/30 BRADY SAND AND 354,712# 12/20 ARIZONA SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1901 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/15/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 64
BTU_GAS 992
CALC_BBLS_H2O 64
GRAVITY_OIL 566
TUBING_PRESS 3
Perforation Data:
Interval Top:572 ft.# Of Holes:101
Interval Bottom:1797 ft.Hole Size:0.45 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)119
GOR
GOR DeterminationMCFE
Average BOE per Day0.056
Average MCFE per Day0.320

 Federal Financial Assurance  i 

 Tribal Well  i No