Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09131
Well Classification: CBM Status: PR - 10/1/2025
Well Name/No:APACHE CANYON #05-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2025
FacilityID:288593LocationID:309134
County:LAS ANIMAS #071Location:SWSW 5 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7994 ft.
Basin:RATON BASIN  
Planned Location:1143FSL  407 FWLLat/Long: 37.109140 / -104.918910Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.109162 / -104.918828Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/1/2025             Measured TD: 2580 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/1/2025
Wellbore Permit
Permit #:20080010 Expiration Date:1/16/2009
Proposed Depth/Form:2490 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1774 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 310, Top: 0 ft., Bottom: 1774 ft.

Wellbore Completed
Completion Date:2/21/2008
Spud Date:2/19/2008Spud Date Is:ACTUAL
Measured TD:2580 ft.Measured PB depth:2499 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND. COMP DEN NEUT. GR/CBL/CCL (2)
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 78, Top: 0 ft., Bottom: 46 ft., Determination Method: CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 452 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 452 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2545 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 1050 ft., Bottom: 2545 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: , Size: 5.5 in., Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 146, Top: 797 ft., Bottom: , Determination Method: CBL
Casing:String Type: 3RD, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 130, Top: 30 ft., Bottom: , Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1947 ft.NN
VERMEJO COAL1947 ft.2301 ft.NN
TRINIDAD2301 ft.2580 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 10/1/2025                 Interval Top: 541 ft.    Interval Bottom: 2282 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:6/30/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/9/2008
Treatment Summary:PUMPED 5000 GALS 15% HCI ACID. FRAC'D W/311555 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 146516 # 16/30 BRADY SAND AND 454498 # 12/20 BRADY SAND
Tubing Size:2.875 in.Tubing Setting Depth:2361 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2008Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 102
BBLS_OIL 0
BTU_GAS 1006
CALC_BBLS_H2O 102
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
CASING_PRESS 5
GRAVITY_OIL 1
MCF_GAS 0
TUBING_PRESS 4
Perforation Data:
Interval Top:541 ft.# Of Holes:138
Interval Bottom:2282 ft.Hole Size:0.45 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No