|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 5/9/2008 Measured TD: 2100 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 5/9/2008 | Wellbore Permit | | Permit #: | 20065348 | Expiration Date: | 12/7/2007 | Proposed Depth/Form: | 2050 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1319 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 230, Top: 0 ft., Bottom: 1319 ft. |
| | |
Wellbore Completed | Completion Date: | 3/24/2007 | Spud Date: | 3/20/2007 | Spud Date Is: | ACTUAL | Measured TD: | 2100 ft. | Measured PB depth: | 2018 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DUAL INDUCTION/COMP DENSITY NEUTRON W/GR & CALIPER | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 49 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 87, Top: 0 ft., Bottom: 49 ft., Determination Method: CALC | Casing: | String Type: SURF, Hole Size: 13.375 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 371, Top: 0 ft., Bottom: 850 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2065 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 245, Top: 0 ft., Bottom: 2065 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1359 ft. | N | N | VERMEJO COAL | 1451 ft. | 1830 ft. | N | N | TRINIDAD | 1830 ft. | 2102 ft. | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 2/1/2012 Interval Top: 1217 ft. Interval Bottom: 1791 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 7/24/2007 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/20/2007 | Treatment Summary: | ACIDIZED W/2250 GALS 15% HCL ACID. FRAC'D W/111,337 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 129,300# 16/30 BRADY SAND AND 100,349# 12/20 BRADY SAND. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1889 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/27/2007 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 112 | BTU_GAS | 1009 | CALC_BBLS_H2O | 112 | CALC_MCF_GAS | 35 | CASING_PRESS | 8 | MCF_GAS | 35 | TUBING_PRESS | 4 |
| Perforation Data: | Interval Top: | 1217 ft. | # Of Holes: | 58 | Interval Bottom: | 1791 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 6216 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 2.934 |
Average MCFE per Day | 17.027 |
Federal Financial Assurance | i | |
|
|