Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09109
Well Classification: CBM Status: PR - 7/24/2007
Well Name/No:GOLDEN EAGLE #30-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/24/2007
FacilityID:288301LocationID:309120
County:LAS ANIMAS #071Location:SESE 30 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7419 ft.
Basin:RATON BASIN  
Planned Location:294FSL  881 FELLat/Long: 37.136930 / -104.921480Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.136890 / -104.921400Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/24/2007             Measured TD: 2052 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/24/2007
Wellbore Permit
Permit #:20065347 Expiration Date:12/7/2007
Proposed Depth/Form:2000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1274 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 220, Top: 0 ft., Bottom: 1274 ft.

Wellbore Completed
Completion Date:2/24/2007
Spud Date:2/22/2007Spud Date Is:ACTUAL
Measured TD:2052 ft.Measured PB depth:2005 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMBO DUAL IND, COMP DEN,NEU LOGS W/GR&CALIPER,GR/CBL/CCL
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 22 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 9, Top: 0 ft., Bottom: 22 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 249, Top: 0 ft., Bottom: 500 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2051 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 596 ft., Bottom: 2051 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 562 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 76, Top: 0 ft., Bottom: , Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1296 ft.NN
VERMEJO COAL1386 ft.1778 ft.NN
TRINIDAD1778 ft.2052 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/24/2007                 Interval Top: 548 ft.    Interval Bottom: 1755 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/20/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/4/2007
Treatment Summary:ACIDIZE W/4000 GALS 15% HCL ACID. FRAC'D W/209,165 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 26,000# 16/30 BRADY SAND AND 453,358# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1835 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/24/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 197
BTU_GAS 1009
CALC_BBLS_H2O 197
CALC_MCF_GAS 156
CASING_PRESS 6
MCF_GAS 156
TUBING_PRESS 3
Perforation Data:
Interval Top:548 ft.# Of Holes:115
Interval Bottom:1755 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)16215
GOR
GOR DeterminationMCFE
Average BOE per Day7.669
Average MCFE per Day44.462

 Federal Financial Assurance  i 

 Tribal Well  i No