Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-09108
Well Classification: CBM Status: PR - 5/1/2025
Well Name/No:GOLDEN EAGLE #31-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:288302LocationID:309119
County:LAS ANIMAS #071Location:NWNE 31 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7525 ft.
Planned Location:722FNL  2074 FELLat/Long: 37.133810 / -104.926220Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.133790 / -104.926200Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/1/2025             Measured TD: 2150 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/1/2025
Wellbore Permit
Permit #:20065346 Expiration Date:12/7/2007
Proposed Depth/Form:2075 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1325 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 230, Top: 0 ft., Bottom: 1325 ft.

Wellbore Completed
Completion Date:2/26/2007
Spud Date:2/24/2007Spud Date Is:ACTUAL
Measured TD:2150 ft.Measured PB depth:2096 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND; COM DENSITY NEUTRON W/GR&CALIPER/GR/CBL/CCL
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 23 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 8, Top: 0 ft., Bottom: 23 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.375 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 238, Top: 1890 ft., Bottom: 500 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2141 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 355, Top: 0 ft., Bottom: 2141 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1860 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 110, Top: , Bottom: , Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 1392 ft., Depth: 1860 ft., Bottom: 1854 ft., Sacks: 110, Method: PERF & PUMP
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 110 ft., Bottom: 1854 ft., Sacks: , Method: PERF & PUMP
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1413 ft.NN
VERMEJO COAL1480 ft.1886 ft.NN
TRINIDAD1886 ft.2151 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/1/2025                  Interval Top: 575 ft.    Interval Bottom: 1841 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/10/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/26/2007
Treatment Summary:ACIDEIZED W/ 4000 GALS 15% HCI ACID FRACD W/ 206,151 GALS 20# DELTA 140 W/ SANDWEDGE OS CARRYING 136,057# 16/30 AND 289,060# 12/20 BRADY SAND
Tubing Size:2.875 in.Tubing Setting Depth:1945 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/13/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 409
BBLS_OIL 0
BTU_GAS 1008
CALC_BBLS_H2O 409
CASING_PRESS 30
GRAVITY_OIL 559
MCF_GAS 0
TUBING_PRESS 5
Perforation Data:
Interval Top:575 ft.# Of Holes:124
Interval Bottom:1841 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)9094
GOR
GOR DeterminationMCFE
Average BOE per Day4.266
Average MCFE per Day24.743

 Federal Financial Assurance  i 

 Tribal Well  i No