Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08928
Well Classification: CBM Status: PR - 2/15/2008
Well Name/No:APACHE CANYON #18-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/15/2008
FacilityID:286228LocationID:308990
County:LAS ANIMAS #071Location:SESE 18 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7898 ft.
Basin:RATON BASIN  
Planned Location:9FSL  228 FELLat/Long: 37.077042 / -104.921064Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.077050 / -104.921021Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/15/2008             Measured TD: 2455 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/15/2008
Wellbore Permit
Permit #:20063025 Expiration Date:8/15/2007
Proposed Depth/Form:2400 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1700 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 300, Top: 0 ft., Bottom: 1700 ft.

Wellbore Completed
Completion Date:2/2/2007
Spud Date:1/31/2007Spud Date Is:ACTUAL
Measured TD:2455 ft.Measured PB depth:2383 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL, CD/NL, CBL (2)
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 20 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 8, Top: 0 ft., Bottom: 20 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 586 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 267, Top: 0 ft., Bottom: 586 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2429 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 130 ft., Bottom: 2429 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 2058 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 91, Top: 1670 ft., Bottom: 2110 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1729 ft.NN
VERMEJO COAL1809 ft.2179 ft.NN
TRINIDAD2179 ft.2453 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 12/13/2011                Interval Top: 1862 ft.    Interval Bottom: 2112 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:4/28/2007Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/1/2007
Treatment Summary:Acidized w/1,250 gals 15% HCl acid. Frac'd w/88,974 gals 20# Delta 140 w/Sandwedge OS carrying 10,700# 16/30 Brady sd & 180,457# 12/20 Brady sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1862 ft.# Of Holes:44
Interval Bottom:2112 ft.Hole Size:0.45 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/1/2007                  Interval Top: 834 ft.    Interval Bottom: 2112 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:4/28/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2234 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/1/2007Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 101
BTU_GAS 999
CALC_BBLS_H2O 101
CALC_MCF_GAS 22
CASING_PRESS 14
MCF_GAS 22
TUBING_PRESS 2
Perforation Data:
Interval Top:834 ft.# Of Holes:92
Interval Bottom:2112 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 12/13/2011                Interval Top: 834 ft.    Interval Bottom: 1141 ft.

 Completed Information for Formation RATON COAL
1st Production Date:4/28/2007Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/1/2007
Treatment Summary:Acidized w/1,750 gals 15% HCl acid. Frac'd w/93,430 gals 20# Delta 140 w/Sandwedge OS carrying 17,000# 16/30 Brady sd & 222,229# 12/20 Brady sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:834 ft.# Of Holes:48
Interval Bottom:1141 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)12720
GOR
GOR DeterminationMCFE
Average BOE per Day6.021
Average MCFE per Day34.907

 Federal Financial Assurance  i 

 Tribal Well  i No