|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: SI - 9/1/2023 Measured TD: 2155 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM SI - 9/1/2023 | Wellbore Permit | | Permit #: | 20063023 | Expiration Date: | 8/16/2007 | Proposed Depth/Form: | 2025 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1363 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 230, Top: 0 ft., Bottom: 1363 ft. |
| | |
Wellbore Completed | Completion Date: | 1/21/2007 | Spud Date: | 1/19/2007 | Spud Date Is: | ACTUAL | Measured TD: | 2155 ft. | Measured PB depth: | 1943 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DUAL IND; COMP DEN NEU W/GR&CALIPER,GR/CBL/CCL | Casing: | String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: , Depth: 0 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 23, Top: 8 ft., Bottom: 0 ft., Determination Method: CALC | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 501 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 351, Top: 0 ft., Bottom: 501 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1990 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 221, Top: 1015 ft., Bottom: 1990 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 53 ft., Depth: 802 ft., Bottom: 995 ft., Sacks: 138, Method: PERF & PUMP | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1462 ft. | N | N | VERMEJO COAL | 1576 ft. | 1928 ft. | N | N | TRINIDAD | 1928 ft. | 2122 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 6/9/2007 Interval Top: 801 ft. Interval Bottom: 802 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 6/8/2007 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/20/2007 | Treatment Summary: | PPD 40 BBLS GEL WTR W/5#/BBL BARACARB, 1 25#/BBL POLYFLAKE & 6#/BBL N-SEAL @ 165 P0SIG & 3 BPM PPD 138 SX TRINIDAD SURF BLEND MIXED @ 13 PPG @ 175 PSIG &3 BPM RIH W/ GR/ CBL/CCL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation VRMJ. |
| Perforation Data: | Interval Top: | 801 ft. | # Of Holes: | 3 | Interval Bottom: | 802 ft. | Hole Size: | 0.45 in. |
|
Formation RT-VJ Formation Classification: GW Status: SI - 9/1/2023 Interval Top: 659 ft. Interval Bottom: 1874 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 6/8/2007 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/20/2007 | Treatment Summary: | ACIDIZED W/3250 GALS 15% HCI ACID FRAC'D W/209,001 GALS 20# DELTA 140 W/ SANDWEDGE OS CARRYING 37,620# 16/30 AND 428,276# 12/20 BRADY SAND |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1898 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/9/2007 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 63 | BTU_GAS | 1003 | CALC_BBLS_H2O | 63 | CALC_MCF_GAS | 3 | CASING_PRESS | 5 | GRAVITY_OIL | 1 | MCF_GAS | 3 | TUBING_PRESS | 4 |
| Perforation Data: | Interval Top: | 659 ft. | # Of Holes: | 64 | Interval Bottom: | 1874 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 08/31/2023 |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|