Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08813
Well Classification: CBM Status: PR - 2/1/2018
Well Name/No:APACHE CANYON #26-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2018
FacilityID:285127LocationID:308923
County:LAS ANIMAS #071Location:NWNE 26 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8044 ft.
Basin:RATON BASIN  
Planned Location:234FNL  2495 FELLat/Long: 37.061710 / -104.964302Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.061699 / -104.964313Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/1/2018             Measured TD: 1945 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/1/2018
Wellbore Permit
Permit #:20061872 Expiration Date:6/12/2007
Proposed Depth/Form:1850 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1221 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 220, Top: 0 ft., Bottom: 1221 ft.

Wellbore Completed
Completion Date:1/18/2007
Spud Date:1/16/2007Spud Date Is:ACTUAL
Measured TD:1945 ft.Measured PB depth:1848 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND./COMP DENSITY NEUTRON W/GR&CALIPER, GR/CBL/CCL
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 25 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 10, Top: 0 ft., Bottom: 25 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 281, Top: 0 ft., Bottom: 500 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1893 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 765 ft., Bottom: 1893 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 121, Top: 62 ft., Bottom: 650 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1280 ft.NN
VERMEJO COAL1399 ft.1694 ft.NN
TRINIDAD1694 ft.1941 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/1/2018                  Interval Top: 535 ft.    Interval Bottom: 1672 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:3/30/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/19/2007
Treatment Summary:ACIDIZED W/2350 GALS 15% HCL ACID. FRAC'D W/163,130 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 14,000# 16/30 BRADY SAND AND 336,105# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1774 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/30/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 937
CASING_PRESS 2
GRAVITY_OIL 1
MCF_GAS 0
TUBING_PRESS 2
Perforation Data:
Interval Top:535 ft.# Of Holes:82
Interval Bottom:1672 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)27742
GOR
GOR DeterminationMCFE
Average BOE per Day13.107
Average MCFE per Day76.041

 Federal Financial Assurance  i 

 Tribal Well  i No