Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08800
Well Classification: CBM Status: PR - 8/1/2021
Well Name/No:GOLDEN EAGLE #20-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2021
FacilityID:284809LocationID:308914
County:LAS ANIMAS #071Location:NESW 20 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7752 ft.
Basin:RATON BASIN  
Planned Location:2119FSL  2197 FWLLat/Long: 37.156585 / -104.912192Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 37.156655 / -104.910968Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/1/2021             Measured TD: 2494 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/1/2021
Wellbore Permit
Permit #:20061508 Expiration Date:5/18/2007
Proposed Depth/Form:2400 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1650 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 1650 ft.

Wellbore Completed
Completion Date:9/19/2006
Spud Date:9/20/2006Spud Date Is:ACTUAL
Measured TD:2494 ft.Measured PB depth:2438 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP DENSITY-NEUTRON W/CALIPER, DUAL IND LOG, CBL
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: , Depth: 23 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 10, Top: 0 ft., Bottom: 23 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 1043 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 1043 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2482 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 468, Top: 0 ft., Bottom: 2482 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1043 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: , Bottom: , Determination Method: CALC
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 400 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1745 ft.NN
VERMEJO COAL1829 ft.2260 ft.NN
TRINIDAD2260 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  PR - 8/1/2021                  Interval Top: 1908 ft.    Interval Bottom: 2232 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:11/2/2006Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/9/2006
Treatment Summary:ACIDIZED W/600 GALS 15% HCI ACID. FRAC'D W/121,850 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 143,722# 16/30 BRADY SAND AND 37,636 # 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2343 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/4/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 104
BTU_GAS 1010
CASING_PRESS 32
GRAVITY_OIL 1
MCF_GAS 129
TUBING_PRESS 8
Perforation Data:
Interval Top:1908 ft.# Of Holes:40
Interval Bottom:2232 ft.Hole Size:0.46 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)2516
GOR
GOR DeterminationMCFE
Average BOE per Day1.189
Average MCFE per Day6.894

 Federal Financial Assurance  i 

 Tribal Well  i No