Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08793
Well Classification: CBM Status: PR - 12/9/2011
Well Name/No:HILL RANCH #27-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/9/2011
FacilityID:284776LocationID:308907
County:LAS ANIMAS #071Location:SWNE 27 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7605 ft.
Basin:RATON BASIN  
Planned Location:2434FNL  2249 FELLat/Long: 37.055792 / -104.873706Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.055309 / -104.874309Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 12/9/2011             Measured TD: 2218 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 12/9/2011
Wellbore Permit
Permit #:20061554 Expiration Date:5/17/2007
Proposed Depth/Form:2175 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1490 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 260, Top: 0 ft., Bottom: 1490 ft.

Wellbore Completed
Completion Date:7/25/2006
Spud Date:7/23/2006Spud Date Is:ACTUAL
Measured TD:2218 ft.Measured PB depth:2192 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL; DUAL IND, COMP DENSITY/NEUTRON W/CALIPER
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: , Depth: 23 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 10, Top: 0 ft., Bottom: 53 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 434 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 434 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2193 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 2193 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1527 ft.NN
VERMEJO COAL1638 ft.1957 ft.NN
TRINIDAD1957 ft.2218 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 12/9/2011                 Interval Top: 644 ft.    Interval Bottom: 1868 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:10/24/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/15/2006
Treatment Summary:ACIDIZED W/3200 GAKS 15% HCI ACID. FRA'D W/224,722 GALS 20# DELTA 140 W/SANDWEDGEA NT CARRYING 154,415# 16/30, 335,499# 12/20 BRADY SAND AND 31,194# 12/20 BRADY SAND W/SUPER LC & SUPERSET W.
Tubing Size:2.875 in.Tubing Setting Depth:1992 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/27/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 123
BTU_GAS 1016
CALC_BBLS_H2O 123
CALC_MCF_GAS 608
CASING_PRESS 8
GRAVITY_OIL 1
MCF_GAS 608
TUBING_PRESS 4
Perforation Data:
Interval Top:644 ft.# Of Holes:68
Interval Bottom:1868 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)24532
GOR
GOR DeterminationMCFE
Average BOE per Day11.590
Average MCFE per Day67.198

 Federal Financial Assurance  i 

 Tribal Well  i No