Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08791
Well Classification: CBM Status: SI - 2/1/2022
Well Name/No:APACHE CANYON #2-4-68
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date2/1/2022
FacilityID:284723LocationID:308905
County:LAS ANIMAS #071Location:NWNW 2 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8058 ft.
Basin:RATON BASIN  
Planned Location:1297FNL  1028 FWLLat/Long: 37.116735 / -104.970402Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.116778 / -104.970376Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/14/2018
End Date: 1/14/2018
Reported: 1/26/2018
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 2/1/2022             Measured TD: 2095 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 2/1/2022
Wellbore Permit
Permit #:20061405 Expiration Date:5/11/2007
Proposed Depth/Form:2050 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1337 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 1337 ft.

Wellbore Completed
Completion Date:6/19/2006
Spud Date:6/16/2006Spud Date Is:ACTUAL
Measured TD:2095 ft.Measured PB depth:2048 ft.
True Vertical TD:True Vertical PB depth:
Log Types:PATTERSON CMT BOND LOG, DUAL INDUCTION LOG, COMP DENSITY NEUTRON LOG
Casing:String Type: CONDUCTOR, Hole Size: 14.75 in., Size: 12.75 in., Top: 0 ft., Depth: 23 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 8, Top: 0 ft., Bottom: 23 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 634 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 294, Top: 0 ft., Bottom: 294 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2050 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 318, Top: 0 ft., Bottom: 2050 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
RATON SAND0 ft.1400 ft.NN
VERMEJO COAL1524 ft.1832 ft.NN
TRINIDAD1832 ft.2088 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 2/1/2021                  Interval Top: 661 ft.    Interval Bottom: 1815 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:8/20/2006Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/17/2006
Treatment Summary:A. W/2400 GALS 15% CHI ACID. FRAC'D W/179,055 GALS 20# DELTA 140 W/SW NT CARRYING 17,600# 16/30 & 291,500# 12/20 BRADY SD.
Tubing Size:2.875 in.Tubing Setting Depth:1873 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/21/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 37
BTU_GAS 1002
CALC_BBLS_H2O 37
GRAVITY_OIL 571
Perforation Data:
Interval Top:661 ft.# Of Holes:69
Interval Bottom:1815 ft.Hole Size:0.46 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 2/1/2022                  Interval Top: 660 ft.    Interval Bottom: 1828 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/20/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/14/2018Treatment End Date:1/14/2018
Treatment Summary:Perforated four Vermejo Coal intervals listed by stage with 4 SPF and 120 degree phasing and fraced the four Vermejo Coal intervals including Stage 1 - 1,812' - 16', 1,818' - 20' and 1,825' - 28', Stage 2 - 1,779' - 81', Stage 3 - 1,691' - 93', 1,703' - 06', 1,709' - 11' and 1,726' - 29' and Stage 4 - 1,587' - 96' and 1,622' - 24' (net - 32' or 128 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 136,156 gallons of produced water, 153,122 lbs of 20/40 mesh Premium White Sand and 890,066 scf N2 were pumped. All four stages were fraced according to prognosis. Perforated two Raton Coal intervals listed by stage with 4 SPF and 120 degree phasing and fraced the two Raton Coal intervals including Stage 5 - 725' - 728' and Stage 6 - 660' - 65' and 684' - 92' (net - 16' or 64 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 78,557 gallons of produced water, 73,048 lbs 20/40 mesh Premium White Sand and 343,275 scf N2 were pumped. Both stages were fraced according to prognosis. The CTU rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton-Vermejo well.
Total fluid used in treatment (bbls):5112Max pressure during treatment (psi):3098
Total gas used in treatment (mcf):1233341Fluid density (lbs/gal):8.35
Type Of gas:NITROGENNumber Of staged intervals:6
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.46
Recycled water used in treatment (bbls):5112Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):226170Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:1844 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/19/2018Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 117
BTU_GAS 989
CALC_BBLS_H2O 117
CASING_PRESS 4
TUBING_PRESS 3
Perforation Data:
Interval Top:660 ft.# Of Holes:192
Interval Bottom:1828 ft.Hole Size:0.45 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
01/31/2021
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No