|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 4/29/2020 Measured TD: 2150 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 4/29/2020 | | Wellbore Permit | | | Permit #: | 20060640 | Expiration Date: | 4/5/2007 | | Proposed Depth/Form: | 2100 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 6/26/2006 | | Spud Date: | 6/24/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 2150 ft. | Measured PB depth: | 2139 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DUAL IND, COMP DENSITY/NEUTRON, CBL(2) | | Casing: | String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 32 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 12, Top: 0 ft., Bottom: 32 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 225 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 88, Top: 0 ft., Bottom: 225 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2140 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 355, Top: 0 ft., Bottom: 2140 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1389 ft. | N | N | | VERMEJO COAL | 1518 ft. | 1888 ft. | N | N | | TRINIDAD | 1888 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 4/29/2020 Interval Top: 1628 ft. Interval Bottom: 1856 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/20/2006 | | Treatment Summary: | ACIDIZED W/600 GALS 15% HCI ACID. FRAC'D W/64,103 GALS 20# DELTA 140 FRAC FLUID CARRYING 7,000# 16/30 AND 97,0003 12/20 BRADY SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 68 | | BTU_GAS | 1010 | | CALC_BBLS_H2O | 68 | | CASING_PRESS | 1 | | MCF_GAS | 0 | | TUBING_PRESS | 3 |
| | Perforation Data: | | Interval Top: | 1628 ft. | # Of Holes: | 24 | | Interval Bottom: | 1856 ft. | Hole Size: | 0.46 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 4/29/2020 Interval Top: 323 ft. Interval Bottom: 1856 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 10/2/2006 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/2/2018 | Treatment End Date: | 8/14/2018 | | Treatment Summary: | Perforate Raton-Vermejo Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton-Vermejo Coal intervals including Stage 1 - 1,880' - 83' and 1,872' - 74', Stage 2 - 798' - 800', 790' - 92' and 786' - 89', Stage 3 - 745' - 48' and 714' - 18', Stage 4 651' - 54' and 608' - 12' (26' net or 78 holes). A total of 123,900 gallons of produced water with 75,558 gallons x-link and 66,272 lbs of 20/40 mesh Premium White Sand were pumped. All four stages were pumped according to design.
The ECWS #28 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a Raton- Vermejo Coal well. | | Total fluid used in treatment (bbls): | 4749 | Max pressure during treatment (psi): | 3114 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 4 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.17 | | Recycled water used in treatment (bbls): | 4749 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | | | Total proppant used (lbs): | 66272 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/15/2018 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 146 | | BTU_GAS | 999 | | CALC_BBLS_H2O | 146 | | CALC_MCF_GAS | 64 | | MCF_GAS | 64 | | TUBING_PRESS | 4 |
| | Perforation Data: | | Interval Top: | 323 ft. | # Of Holes: | 32 | | Interval Bottom: | 1856 ft. | Hole Size: | 0.4 in. |
|
Formation RTON Formation Classification: GW Status: CM - 4/29/2020 Interval Top: 323 ft. Interval Bottom: 971 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/22/2006 | | Treatment Summary: | PERF'D SQZ HOLES FR/970-971',4 SHOTS.PPD 240 SX TRINIDAD PRODUCTION BLEND CMT W/NO RETURNS TO SURFACE. PERF'D SQZ HOLE FR/323-324',4SHOTS. PPD 96 SX TRINIDAT PRODUCTION BLEND CMT W/7 BBLS CIRCULATED TO SURFACE. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 323 ft. | # Of Holes: | 8 | | Interval Bottom: | 971 ft. | Hole Size: | 0.46 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 12840 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 6.039 |
| Average MCFE per Day | 35.024 |
| Federal Financial Assurance | i | |
|
|