Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08746
Well Classification: GW Status: PR - 9/1/2017
Well Name/No:APACHE CANYON #12-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2017
FacilityID:284119LocationID:308868
County:LAS ANIMAS #071Location:NWNW 12 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8504 ft.
Basin:RATON BASIN  
Planned Location:272FNL  146 FWLLat/Long: 37.105223 / -104.955294Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.105226 / -104.955310Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2017             Measured TD: 2500 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2017
Wellbore Permit
Permit #:20060639 Expiration Date:4/5/2007
Proposed Depth/Form:2400 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/6/2006
Spud Date:8/3/2006Spud Date Is:ACTUAL
Measured TD:2500 ft.Measured PB depth:2429 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUCTION; COMP DENSITY/NEUTRON W/CALIPER; CBL
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 23 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 8, Top: , Bottom: 23 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 806 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 528, Top: 0 ft., Bottom: 806 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2478 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 371, Top: 1544 ft., Bottom: 2478 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1541 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 1260 ft., Bottom: 1541 ft., Determination Method: CALC
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1254 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 1254 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
RATON SAND0 ft.1800 ft.NN
VERMEJO COAL1888 ft.2245 ft.NN
TRINIDAD2245 ft.2496 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 9/1/2017                  Interval Top: 1253 ft.    Interval Bottom: 1541 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/4/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/21/2006
Treatment Summary:PPD 375 SX TRINIDAD PROD BLEND CMT MIXED@ 13# GAL. PPD @2-3 BPM &45 &310 PSIG W/NO RETURNS TO SURF. DISPL CMT W/3 & 4 BPW @25 PSIG & 200 PSIG. CIRC 10 SX CMT TO SURF. STING OUT OF CICR. TGD CICR @ 1182'. DO 1' CMT TO CICR @ 1182'. (NEXT PAGE)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 84
BBLS_OIL 0
BTU_GAS 1009
CALC_BBLS_H2O 84
CALC_BBLS_OIL 0
CALC_MCF_GAS 1
CASING_PRESS 12
GRAVITY_OIL 1
MCF_GAS 1
TUBING_PRESS 3
Perforation Data:
Interval Top:1253 ft.# Of Holes:8
Interval Bottom:1541 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)19637
GOR
GOR DeterminationMCFE
Average BOE per Day9.285
Average MCFE per Day53.818

 Federal Financial Assurance  i 

 Tribal Well  i No