|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 5/28/2025 Measured TD: 2025 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 5/28/2025 | | Wellbore Permit | | | Permit #: | 20060288 | Expiration Date: | 3/8/2007 | | Proposed Depth/Form: | 2050 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 3/21/2006 | | Spud Date: | 3/18/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 2025 ft. | Measured PB depth: | 1933 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL, CD/CNL, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: 12.75 in., Top: 0 ft., Depth: 23 ft., Weight: N/A , Citings Type: ACTUAL | | Cement: | Sacks: 8, Top: 0 ft., Bottom: 23 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 501 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 254, Top: 0 ft., Bottom: 501 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1980 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 300 ft., Bottom: 1980 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON SAND | 0 ft. | 1351 ft. | N | N | | RATON COAL | 1351 ft. | 1447 ft. | N | N | | VERMEJO COAL | 1447 ft. | 1860 ft. | N | N | | TRINIDAD | 1860 ft. | 1992 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: AB - 5/28/2025 Interval Top: 1663 ft. Interval Bottom: 1834 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 8/8/2006 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 4/25/2017 | Treatment End Date: | N/A | | Treatment Summary: | **Perf Top CORRECTION from 1696' to 1663'**
06/09/2015: MIRU. TOH w/rods & rotor. Tgd @ 1,916' (16' fill). Vermejo perfs fr/1,663' - 1,834'. TOH w/ 2-7/8" tbg & stator.
06/10/2015: Set CIBP @ 1,770’. TIH w/stator & 2-7/8", 6.5#, J-55 tbg. EOT @ 1,754. Vermejo perfs fr/1,663' - 1,756'. TIH w/rotor & rods. RDMO. Std PC pmp @ 100 RPM & RWTP @ 2:30 a.m. 6/10/15. FR for zone Isolation.
04/25/2017: MIRU. TOH w/rods & rotor. Tgd @ 1,916' (16' fill). Vermejo perfs fr/1,663' - 1,756'. TOH w/ 2-7/8" tbg & stator. Set CIBP @ 1,646'. PT 5-1/2" csg to 375 psig w/1 BPW. Tstd OK. RDMO. SWI. WO MIT.
05/12/2017: Peformed MIT | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 7/3/2006 | | Treatment Summary: | ACIDIZED W/1550 GALS 15% HCI ACID. FRAC W/120,980 GALS 203 DELTA 140 W/SANDWEDGE NT CARRYING 172,197# 16/30 BRADY SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 99 | | BTU_GAS | 1001 | | CASING_PRESS | 1 | | GRAVITY_OIL | 1 | | TUBING_PRESS | 1 |
| | Perforation Data: | | Interval Top: | 1663 ft. | # Of Holes: | 40 | | Interval Bottom: | 1834 ft. | Hole Size: | 0.46 in. |
|
Formation RTON Formation Classification: GW Status: AB - 5/28/2025 Interval Top: 1410 ft. Interval Bottom: 1446 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 5/29/2019 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 3/20/2025 | Treatment End Date: | N/A | | Treatment Summary: | Perforated two intervals in the Raton formation. 1st interval is 1434-1446'. 2nd interval is 1410-1420', | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 1410 ft. | # Of Holes: | 88 | | Interval Bottom: | 1446 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/28/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|