Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08732
Well Classification: GW Status: PA - 5/28/2025
Well Name/No:GOLDEN EAGLE #28-7X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/28/2025
FacilityID:283708LocationID:311983
County:LAS ANIMAS #071Location:SWNE 28 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7399 ft.
Basin:RATON BASIN  
Planned Location:1456FNL  1824 FELLat/Long: 37.146428 / -104.889565Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 37.146688 / -104.890373Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 5/28/2025             Measured TD: 2025 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 5/28/2025
Wellbore Permit
Permit #:20060288 Expiration Date:3/8/2007
Proposed Depth/Form:2050 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/21/2006
Spud Date:3/18/2006Spud Date Is:ACTUAL
Measured TD:2025 ft.Measured PB depth:1933 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL, CD/CNL, CBL
Casing:String Type: CONDUCTOR, Hole Size: , Size: 12.75 in., Top: 0 ft., Depth: 23 ft., Weight: N/A , Citings Type: ACTUAL
Cement:Sacks: 8, Top: 0 ft., Bottom: 23 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 501 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 254, Top: 0 ft., Bottom: 501 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1980 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 300 ft., Bottom: 1980 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON SAND0 ft.1351 ft.NN
RATON COAL1351 ft.1447 ft.NN
VERMEJO COAL1447 ft.1860 ft.NN
TRINIDAD1860 ft.1992 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  AB - 5/28/2025                 Interval Top: 1663 ft.    Interval Bottom: 1834 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:8/8/2006Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/25/2017Treatment End Date:N/A
Treatment Summary:**Perf Top CORRECTION from 1696' to 1663'** 06/09/2015: MIRU. TOH w/rods & rotor. Tgd @ 1,916' (16' fill). Vermejo perfs fr/1,663' - 1,834'. TOH w/ 2-7/8" tbg & stator. 06/10/2015: Set CIBP @ 1,770’. TIH w/stator & 2-7/8", 6.5#, J-55 tbg. EOT @ 1,754. Vermejo perfs fr/1,663' - 1,756'. TIH w/rotor & rods. RDMO. Std PC pmp @ 100 RPM & RWTP @ 2:30 a.m. 6/10/15. FR for zone Isolation. 04/25/2017: MIRU. TOH w/rods & rotor. Tgd @ 1,916' (16' fill). Vermejo perfs fr/1,663' - 1,756'. TOH w/ 2-7/8" tbg & stator. Set CIBP @ 1,646'. PT 5-1/2" csg to 375 psig w/1 BPW. Tstd OK. RDMO. SWI. WO MIT. 05/12/2017: Peformed MIT
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/3/2006
Treatment Summary:ACIDIZED W/1550 GALS 15% HCI ACID. FRAC W/120,980 GALS 203 DELTA 140 W/SANDWEDGE NT CARRYING 172,197# 16/30 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 99
BTU_GAS 1001
CASING_PRESS 1
GRAVITY_OIL 1
TUBING_PRESS 1
Perforation Data:
Interval Top:1663 ft.# Of Holes:40
Interval Bottom:1834 ft.Hole Size:0.46 in.

Formation RTON                     Formation Classification:  GW                     Status:  AB - 5/28/2025                 Interval Top: 1410 ft.    Interval Bottom: 1446 ft.

 Completed Information for Formation RATON COAL
1st Production Date:5/29/2019Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/20/2025Treatment End Date:N/A
Treatment Summary:Perforated two intervals in the Raton formation. 1st interval is 1434-1446'. 2nd interval is 1410-1420',
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:1410 ft.# Of Holes:88
Interval Bottom:1446 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/28/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No