|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: AB - 6/5/2025 Measured TD: 2356 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM AB - 6/5/2025 | | Wellbore Permit | | | Permit #: | 20060287 | Expiration Date: | 3/8/2007 | | Proposed Depth/Form: | 2350 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 3/25/2006 | | Spud Date: | 3/22/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 2356 ft. | Measured PB depth: | 2271 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CD/CNL, GR/CBL/CCL | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: 12.75 in., Top: , Depth: 23 ft., Weight: N/A , Citings Type: ACTUAL | | Cement: | Sacks: 8, Top: 0 ft., Bottom: 23 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: , Depth: 856 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 406, Top: 0 ft., Bottom: 856 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2319 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: 41 ft., Bottom: 2319 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1666 ft. | N | N | | VERMEJO COAL | 1736 ft. | 2148 ft. | N | N | | TRINIDAD | 2148 ft. | | N | N |
Formation VRMJ Formation Classification: CBM Status: AB - 6/5/2025 Interval Top: 1815 ft. Interval Bottom: 2105 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 10/4/2006 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/5/2006 | | Treatment Summary: | ACIDIZED W/ 2000 GALS 15% HCI ACID. FRAC'D W/ 81,664 GALS 20# DELTA 140 W/ SANDWEDGE NT CARRYING 177,640# 16/30 BRADY SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 37 | | BBLS_OIL | 0 | | BTU_GAS | 1009 | | CALC_BBLS_H2O | 37 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 0 | | GRAVITY_OIL | 1 | | MCF_GAS | 0 | | TUBING_PRESS | 2 |
| | Perforation Data: | | Interval Top: | 1815 ft. | # Of Holes: | 27 | | Interval Bottom: | 2105 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/05/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|