Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08697
Well Classification: CBM Status: PR - 11/2/2007
Well Name/No:GOLDEN EAGLE #19-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/2/2007
FacilityID:282948LocationID:308829
County:LAS ANIMAS #071Location:NWSE 19 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7253 ft.
Basin:RATON BASIN  
Planned Location:2684FSL  1825 FELLat/Long: 37.157850 / -104.924718Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.157799 / -104.924790Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 11/2/2007             Measured TD: 2100 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 11/2/2007
Wellbore Permit
Permit #:20055112 Expiration Date:1/30/2007
Proposed Depth/Form:2025 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/5/2006
Spud Date:3/3/2006Spud Date Is:ACTUAL
Measured TD:2100 ft.Measured PB depth:1990 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR/ CBL/ CCL, DIL, CDNL
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: , Depth: 23 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 9, Top: 0 ft., Bottom: 23 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 591 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 591 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2049 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 66 ft., Bottom: 2049 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: , Depth: 1398 ft., Bottom: , Sacks: 100, Method: PERF & PUMP
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1298 ft.NN
VERMEJO COAL1396 ft.1794 ft.NN
TRINIDAD1795 ft.2090 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  PR - 11/2/2007                 Interval Top: 1453 ft.    Interval Bottom: 1760 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:1/20/2007Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/15/2006
Treatment Summary:ACIDIZE W/ 1500 GAL 15% HCL ACID. FRAC'D W/ 82,301 GALS 20# DELTA 140 W/ SANDWEDGE NT CARRYING 158,420# 16/30 BRADY SAND
Tubing Size:2.875 in.Tubing Setting Depth:1861 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/7/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 102
BBLS_OIL 0
BTU_GAS 1011
CALC_BBLS_H2O 102
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
CASING_PRESS 130
MCF_GAS 0
TUBING_PRESS 2
Perforation Data:
Interval Top:1453 ft.# Of Holes:40
Interval Bottom:1760 ft.Hole Size:0.4 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)3418
GOR
GOR DeterminationMCFE
Average BOE per Day1.617
Average MCFE per Day9.367

 Federal Financial Assurance  i 

 Tribal Well  i No