Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08674
Well Classification: CBM Status: PR - 4/1/2021
Well Name/No:GOLDEN EAGLE #31-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2021
FacilityID:282620LocationID:308813
County:LAS ANIMAS #071Location:SENE 31 33S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7462 ft.
Planned Location:1911FNL  1297 FELLat/Long: 37.130743 / -104.924174Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.130678 / -104.924203Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 4/1/2021             Measured TD: 2150 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 4/1/2021
Wellbore Permit
Permit #:20054306 Expiration Date:1/10/2007
Proposed Depth/Form:2050 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/24/2006
Spud Date:2/22/2006Spud Date Is:ACTUAL
Measured TD:2150 ft.Measured PB depth:2089 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUCTION; COMPENSATED DENSITY/NEUTRON/GR; CBL
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 24 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 9, Top: 0 ft., Bottom: 24 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 230 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 0 ft., Bottom: 230 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2137 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 393, Top: 0 ft., Bottom: 2137 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1314 ft.NN
RATON-VERMEJO COALS1314 ft.1420 ft.NN
VERMEJO COAL1420 ft.1813 ft.NN
TRINIDAD1813 ft.2145 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 7/21/2006                 Interval Top: 1317 ft.    Interval Bottom: 1787 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:7/11/2006Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/21/2006
Treatment Summary:ACIDIZED W/3250 GALS 15% HCI ACID. FRAC'D W/324,748 GALS 20# DELTA 140 CARRYING 90,000# 16/30 AND 703,035 12/20 BRANDY SD.
Tubing Size:2.875 in.Tubing Setting Depth:1894 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/21/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 129
BBLS_OIL 0
BTU_GAS 1091
CALC_BBLS_H2O 129
CALC_BBLS_OIL 0
CALC_MCF_GAS 71
CASING_PRESS 9
GRAVITY_OIL 1
MCF_GAS 71
TUBING_PRESS 6
Perforation Data:
Interval Top:1317 ft.# Of Holes:65
Interval Bottom:1787 ft.Hole Size:0.41 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 4/1/2021                  Interval Top: 1314 ft.    Interval Bottom: 1787 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/21/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 7/21/2006                 Interval Top: 422 ft.    Interval Bottom: 723 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/11/2006Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/12/2006
Treatment Summary:ACIDIZED W/1100 GALS 15% HCI ACID. FRAC'D W/140,400 GALS 20# DELTA 140 S/SANDWEDGE NT CARRYING 9700# 16/30 AND 272,000# 12/20 BRANDY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1894 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/21/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 129
BBLS_OIL 0
BTU_GAS 1091
CALC_BBLS_H2O 129
CALC_BBLS_OIL 0
CALC_MCF_GAS 71
CASING_PRESS 9
GRAVITY_OIL 1
MCF_GAS 71
TUBING_PRESS 6
Perforation Data:
Interval Top:422 ft.# Of Holes:39
Interval Bottom:723 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)14388
GOR
GOR DeterminationMCFE
Average BOE per Day6.796
Average MCFE per Day39.414

 Federal Financial Assurance  i 

 Tribal Well  i No