|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/4/2022 Measured TD: 2455 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/4/2022 | Wellbore Permit | | Permit #: | 20052410 | Expiration Date: | 8/10/2006 | Proposed Depth/Form: | 2300 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 10/20/2005 | Spud Date: | 8/22/2005 | Spud Date Is: | ACTUAL | Measured TD: | 2455 ft. | Measured PB depth: | 1663 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | PLATFORM EXPRESS TEMP TOOL, ARRAY IND GR, TRIPLE LITHOLOGY DEN COMP. | Casing: | String Type: SURF, Hole Size: , Size: 5.625 in., Top: , Depth: 204 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 110, Top: 0 ft., Bottom: 204 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2455 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 178, Top: 1736 ft., Bottom: 2455 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1473 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 248, Top: 25 ft., Bottom: 1473 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1655 ft. | N | N | VERMEJO COAL | 1818 ft. | 2230 ft. | N | N | TRINIDAD | 2230 ft. | | N | N |
Formation RT-VJ Formation Classification: GW Status: AB - 11/4/2022 Interval Top: 743 ft. Interval Bottom: 2097 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 2/20/2006 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 1/27/2014 | Treatment End Date: | 2/1/2014 | Treatment Summary: | XTO squeezed off perf's fr/663'-693' on 02/01/2014 with 70 sx Type B cmt.
A Sbsq Form 4 has also been filed. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 1/25/2006 | Treatment Summary: | 1/27/06 A. W/2500 GALS 15% HCL ACID. FRAC'D W/327,195 GALS 20# DELTA 140 CARRYING 92,200# & 504,400 12/20 BRADY SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 200 | BBLS_OIL | 0 | BTU_GAS | 960 | CALC_BBLS_H2O | 200 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 4 | CASING_PRESS | 3 | GRAVITY_OIL | 1 | MCF_GAS | 4 | TUBING_PRESS | 2 |
| Perforation Data: | Interval Top: | 743 ft. | # Of Holes: | 116 | Interval Bottom: | 2097 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | Y | 11/04/2022 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2027 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|