Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08482
Well Classification: GW Status: PA - 11/4/2022
Well Name/No:APACHE CANYON #13-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/4/2022
FacilityID:279261LocationID:308702
County:LAS ANIMAS #071Location:NESW 13 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8265 ft.
Planned Location:1450FSL  1424 FWLLat/Long: 37.081003 / -104.950891Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.080870 / -104.950880Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 11/4/2022             Measured TD: 2455 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 11/4/2022
Wellbore Permit
Permit #:20052410 Expiration Date:8/10/2006
Proposed Depth/Form:2300 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/20/2005
Spud Date:8/22/2005Spud Date Is:ACTUAL
Measured TD:2455 ft.Measured PB depth:1663 ft.
True Vertical TD:True Vertical PB depth:
Log Types:PLATFORM EXPRESS TEMP TOOL, ARRAY IND GR, TRIPLE LITHOLOGY DEN COMP.
Casing:String Type: SURF, Hole Size: , Size: 5.625 in., Top: , Depth: 204 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 110, Top: 0 ft., Bottom: 204 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2455 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 178, Top: 1736 ft., Bottom: 2455 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1473 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 248, Top: 25 ft., Bottom: 1473 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1655 ft.NN
VERMEJO COAL1818 ft.2230 ft.NN
TRINIDAD2230 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  AB - 11/4/2022                 Interval Top: 743 ft.    Interval Bottom: 2097 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:2/20/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/27/2014Treatment End Date:2/1/2014
Treatment Summary:XTO squeezed off perf's fr/663'-693' on 02/01/2014 with 70 sx Type B cmt. A Sbsq Form 4 has also been filed.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:1/25/2006
Treatment Summary:1/27/06 A. W/2500 GALS 15% HCL ACID. FRAC'D W/327,195 GALS 20# DELTA 140 CARRYING 92,200# & 504,400 12/20 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 200
BBLS_OIL 0
BTU_GAS 960
CALC_BBLS_H2O 200
CALC_BBLS_OIL 0
CALC_MCF_GAS 4
CASING_PRESS 3
GRAVITY_OIL 1
MCF_GAS 4
TUBING_PRESS 2
Perforation Data:
Interval Top:743 ft.# Of Holes:116
Interval Bottom:2097 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/04/2022
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2027
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No