Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08473
Well Classification: CBM Status: PR - 1/5/2006
Well Name/No:HILL RANCH #16-09
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/5/2006
FacilityID:279158LocationID:333490
County:LAS ANIMAS #071Location:NESE 16 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7762 ft.
Basin:RATON BASIN  
Planned Location:1910FSL  628 FELLat/Long: 36.995305 / -104.886259Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 36.995250 / -104.886220Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 1/5/2006             Measured TD: 1567 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 1/5/2006
Wellbore Permit
Permit #:20052297 Expiration Date:8/2/2006
Proposed Depth/Form:2270 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/5/2005
Spud Date:10/24/2005Spud Date Is:ACTUAL
Measured TD:1567 ft.Measured PB depth:1523 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: , Depth: 31 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 5, Top: 0 ft., Bottom: 31 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.6 in., Size: 8 in., Top: , Depth: 224 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 119, Top: 0 ft., Bottom: 224 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1567 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 340 ft., Bottom: 1567 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 331 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 331 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1523 ft.NN

Formation RTON                     Formation Classification:  GW                     Status:  PR - 7/1/2011                  Interval Top: 483 ft.    Interval Bottom: 1188 ft.

 Completed Information for Formation RATON COAL
1st Production Date:1/4/2006Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/5/2005
Treatment Summary:A. W/ 1,500 GALS HCL SC. FRAC'D W/ 153,097 GALS 20# DELTA 140 S/ SW NT CARYYING 21,500# 16/30 & 220,800# 12/20 BRADY SD.
Tubing Size:2.875 in.Tubing Setting Depth:1306 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/5/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 89
BBLS_OIL 0
CALC_BBLS_H2O 89
CALC_BBLS_OIL 0
CALC_MCF_GAS 4
CASING_PRESS 70
MCF_GAS 4
TUBING_PRESS 1
Perforation Data:
Interval Top:483 ft.# Of Holes:72
Interval Bottom:1188 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)19249
GOR
GOR DeterminationMCFE
Average BOE per Day9.090
Average MCFE per Day52.734

 Federal Financial Assurance  i 

 Tribal Well  i No