Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08471
Well Classification: CBM Status: PA - 4/25/2025
Well Name/No:APACHE CANYON #14-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/25/2025
FacilityID:279156LocationID:308695
County:LAS ANIMAS #071Location:SWSE 14 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8203 ft.
Planned Location:1189FSL  1843 FELLat/Long: 37.080213 / -104.962091Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.080110 / -104.962050Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/18/2018
End Date: 1/19/2018
Reported: 1/26/2018
Days to report: 7
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: AB - 4/25/2025             Measured TD: 2240 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        AB - 4/25/2025
Wellbore Permit
Permit #:20052316 Expiration Date:8/2/2006
Proposed Depth/Form:2110 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:N/A
Spud Date:8/18/2005Spud Date Is:ACTUAL
Measured TD:2240 ft.Measured PB depth:2158 ft.
True Vertical TD:True Vertical PB depth:
Log Types:PLEX-TLD/CN, PLEX-AI/GR, PLEX-TEMP, CBL
Casing:String Type: CONDUCTOR, Hole Size: 15 in., Size: 12.75 in., Top: 0 ft., Depth: 43 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 9, Top: 0 ft., Bottom: 43 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 76, Top: 0 ft., Bottom: 204 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2187 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 0 ft., Bottom: 2187 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 597 ft., Bottom: 598 ft., Sacks: 30, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1490 ft.NY
RATON SAND1490 ft.1652 ft.NY
VERMEJO COAL1652 ft.1948 ft.NY
TRINIDAD1948 ft.2221 ft.NY

Formation RT-VJ                   Formation Classification:  GW                   Status:  AB - 4/25/2025                 Interval Top: 526 ft.    Interval Bottom: 1928 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:3/25/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/19/2018Treatment End Date:1/19/2018
Treatment Summary:Perforated three Vermejo Coal intervals listed by stage with 4 SPF and 120 degree phasing and fraced the three Vermejo Coal intervals including Stage 1 - 1,895 - 04' and 1,920' - 28', Stage 2 - 1,743' - 50', Stage 3 - 1,678' - 84', 1,692' - 96', 1,700' - 08' and 1,714' - 18' (net - 46' or 184 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total 250 gallons of 15% HCl, 171,414 gallons of produced water, 137,285 lbs of 20/40 mesh Premium White Sand and 814,815 scf N2 were pumped. Stage 1 was pumped according to prognosis. Stage 2 pressure increasing with 1.0 ppg sand on formation. Go to flush. Stage 3 backside pressure increased to 215 psi. Go to flush. Stage 4 pressure increasing with 1.0 ppg sand on formation. Go to flush. Fraced four Raton Coal intervals listed by stage with old XTO and new TCE perforations as designated below and fraced the four Raton Coal intervals including Stage 4 - 864' - 65' and 869' - 70' (XTO perfs with 3 SPF or 3 old holes) , Stage 5 - 792' - 98' (TCE new perfs with 4 SPF and 120 degree phasing) and 808' - 09' (XTO perfs with 3 SPF or 3 old holes), Stage 6 - 594' - 97' (XTO perfs at 3 SPF or 9 old holes) and Stage 7 - 526 - 528' (XTO perfs with 3 SPF or 6 old holes) and 543' - 45' (XTO perfs at 3 SPF or 6 old holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 750 gallons of 15% HCl, 86,640 gallons of produced water, 110,289 lbs of 20/40 mesh Premium White Sand and 643,729 scf N2 were pumped. Stage 5 and Stage 7 were pumped according to prognosis. Stage 5 pumped according to prognosis. Stage 6 could not be broke down and was skipped. Stage 7 fraced pumped according to prognosis. The CTU rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton-Vermejo Coal well.
Total fluid used in treatment (bbls):6161Max pressure during treatment (psi):3447
Total gas used in treatment (mcf):1458544Fluid density (lbs/gal):8.35
Type Of gas:NITROGENNumber Of staged intervals:7
Total acid used in treatment (bbls):17Min frac gradient (psi/ft):0.51
Recycled water used in treatment (bbls):6144Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):247584Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:8/16/2012Treatment End Date:8/21/2012
Treatment Summary:New number of perforations due to Remedial O2 Zone Isolation on perfs fr/594'-597'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:3/8/2006
Treatment Summary:ACIDIZED W/2,682 GALS 15% HCL ACID. FRAC'D W/298,114 GALS 20# DELTA 140 CARRYING 18,233# 16/30 AND 444,799# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2114 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/2/2018Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 0
BTU_GAS 991
CALC_BBLS_H2O 10
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
CASING_PRESS 1
GRAVITY_OIL 1
MCF_GAS 0
TUBING_PRESS 2
Perforation Data:
Interval Top:526 ft.# Of Holes:208
Interval Bottom:1928 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/25/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No