Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08468
Well Classification: CBM Status: SI - 2/1/2025
Well Name/No:NEW ELK #35-09
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date2/1/2025
FacilityID:279153LocationID:308692
County:LAS ANIMAS #071Location:NESE 35 33S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8265 ft.
Planned Location:2114FSL  412 FELLat/Long: 37.126202 / -104.957242Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.126150 / -104.957160Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/22/2017
End Date: 12/24/2017
Reported: 1/25/2018
Days to report: 32
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 2/1/2025             Measured TD: 2425 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 2/1/2025
Wellbore Permit
Permit #:20052314 Expiration Date:8/2/2006
Proposed Depth/Form:2375 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/3/2005
Spud Date:8/27/2005Spud Date Is:ACTUAL
Measured TD:2425 ft.Measured PB depth:2354 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL/GR/TLD/CNL/TEMP
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 676 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 271, Top: 0 ft., Bottom: 676 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2402 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 285, Top: 0 ft., Bottom: 2402 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1659 ft.NN
VERMEJO COAL1813 ft.2134 ft.NN
TRINIDAD2134 ft.2413 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  SI - 2/1/2025                  Interval Top: 1843 ft.    Interval Bottom: 2128 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:3/1/2006Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/24/2017Treatment End Date:12/24/2017
Treatment Summary:Perforated seven Vermejo Coal intervals listed by stage with 4 SPF and 120 degree phasing and fraced the seven Vermejo Coal intervals including Stage 1 - 2,119' - 22' and 2,126'- 28', Stage 2 - 2,081' - 85' and 2,099' - 02', Stage 3 - 2,057' - 60', Stage 4 - 2,026' - 32', Stage 5 - 1,923' - 26', Stage 6 - 1,871' - 75' and Stage 7 - 1,843' - 47' and 1,854' - 56' (net - 34' or 136 holes) with Coiled Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 1,750 gallons 15% HCl, 118,483 gallons of produced water, 140,590 lbs of 20/40 mesh Premium White Sand and 860,326 scf N2 were pumped. The CTU was rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a Vermejo Coal well.
Total fluid used in treatment (bbls):2862Max pressure during treatment (psi):4403
Total gas used in treatment (mcf):860326Fluid density (lbs/gal):8.35
Type Of gas:NITROGENNumber Of staged intervals:7
Total acid used in treatment (bbls):41Min frac gradient (psi/ft):0.54
Recycled water used in treatment (bbls):2821Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):140590Green completions techniques utilized:No
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:2/6/2006
Treatment Summary:2/6/06 A.W/1000 GALS 15% HCL ACID. FRAC'D W/98,703 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 13,491# 16/30 & 148,687# 12/20 BRADY SAND
Tubing Size:2.875 in.Tubing Setting Depth:2151 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/4/2018Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 0
BTU_GAS 1010
CALC_BBLS_H2O 14
CALC_BBLS_OIL 0
CALC_MCF_GAS 16
CASING_PRESS 3
GRAVITY_OIL 1
MCF_GAS 16
TUBING_PRESS 3
Perforation Data:
Interval Top:1843 ft.# Of Holes:136
Interval Bottom:2128 ft.Hole Size:0.4 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)5387
GOR
GOR DeterminationMCFE
Average BOE per Day2.528
Average MCFE per Day14.658

 Federal Financial Assurance  i 

 Tribal Well  i No