|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 11/19/2018 Measured TD: 2035 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 11/19/2018 | | Wellbore Permit | | | Permit #: | 20051796 | Expiration Date: | 6/15/2006 | | Proposed Depth/Form: | 1975 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/1/2005 | | Spud Date: | 6/19/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 2035 ft. | Measured PB depth: | 1964 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | AIL/TLD/CNL/TEMP/GR/CBL/CCL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 203 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 112, Top: 0 ft., Bottom: 203 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2014 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 355, Top: 0 ft., Bottom: 2014 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1320 ft. | N | N | | VERMEJO COAL | 1358 ft. | 1787 ft. | N | N | | TRINIDAD | 1787 ft. | 2033 ft. | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 11/19/2018 Interval Top: 222 ft. Interval Bottom: 1760 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 9/16/2005 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/26/2018 | Treatment End Date: | 8/31/2018 | | Treatment Summary: | Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 1260' - 62 and 1163' - 65', Stage 2 - 833' - 34', 795' - 96', 776' - 79', 727' - 29', 701' - 03' and 688' - 91', Stage 3 - 609' - 15', 541' - 43', 504' - 06' and 482' - 85', Stage 4 - 437' - 39', 428' - 29', 418' - 20', 390' - 94', 348' - 51' and 222' - 24' (41' net or 123 holes). A total of 206,682 gallons of produced water with 107,268 gallons of x-link and 152,666 lbs of 16/30 sand were pumped. All four stages were pumped according to design.
The ECWS #28 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton Vermejo well. | | Total fluid used in treatment (bbls): | 7475 | Max pressure during treatment (psi): | 2894 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 4 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.27 | | Recycled water used in treatment (bbls): | 7475 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | | | Total proppant used (lbs): | 152666 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 9/1/2005 | | Treatment Summary: | ACIDIZED W/1500 GALS 15% HCI ACID. FRAC'D W/144,142 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 218,440# 16/30 BRADY SD. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/4/2018 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 46 | | BBLS_OIL | 0 | | BTU_GAS | 991 | | CALC_BBLS_H2O | 46 | | CALC_MCF_GAS | 8 | | CASING_PRESS | 3 | | MCF_GAS | 8 | | TUBING_PRESS | 1 |
| | Perforation Data: | | Interval Top: | 222 ft. | # Of Holes: | 176 | | Interval Bottom: | 1760 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 4324 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 2.040 |
| Average MCFE per Day | 11.840 |
| Federal Financial Assurance | i | |
|
|