|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 3/6/2006 Measured TD: 2565 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 3/6/2006 | | Wellbore Permit | | | Permit #: | 20051626 | Expiration Date: | 5/23/2006 | | Proposed Depth/Form: | 2475 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 7/22/2005 | | Spud Date: | 6/5/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 2565 ft. | Measured PB depth: | 2407 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | AIL/TLD/CNL/TEMP/GR/CBL/CCL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 629 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 629 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2527 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 2527 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1817 ft. | N | N | | VERMEJO COAL | 1920 ft. | 2301 ft. | N | N | | TRINIDAD | 2301 ft. | 2545 ft. | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 7/1/2011 Interval Top: 1990 ft. Interval Bottom: 2282 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/22/2005 | | Treatment Summary: | ACIDIZED W/1500 GALS 15% HCI ACID. FRAC'D W/145,831 GALS 203 DELTA 140 W/SANDWEDGE NT CARRYING 11,204# 16/30 AND 281,572# 12/20 BRADY |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2332 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/2/2005 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 90 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 90 | | CASING_PRESS | 0 | | MCF_GAS | 0 | | TUBING_PRESS | 2 |
| | Perforation Data: | | Interval Top: | 1990 ft. | # Of Holes: | 62 | | Interval Bottom: | 2282 ft. | Hole Size: | 0.4 in. |
|
Formation RTON Formation Classification: GW Status: CM - 3/6/2006 Interval Top: 791 ft. Interval Bottom: 1306 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 3/5/2006 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/22/2006 | | Treatment Summary: | 1,500 GALS 15% HCL; 229,848 GALS 20# DELTA 140 W/EXPEDITE; 402,700# 12/20 BRADY SAND & 66,700# 16/30 SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2374 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/6/2006 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 130 | | BBLS_OIL | 0 | | BTU_GAS | 1008 | | CALC_BBLS_H2O | 130 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 86000 | | CALC_MCF_GAS | 86 | | CASING_PRESS | 1 | | GRAVITY_OIL | 1 | | MCF_GAS | 86 | | TUBING_PRESS | 10 |
| | Perforation Data: | | Interval Top: | 791 ft. | # Of Holes: | 81 | | Interval Bottom: | 1306 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 16894 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 7.972 |
| Average MCFE per Day | 46.249 |
| Federal Financial Assurance | i | |
|
|