Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08367
Well Classification: CBM Status: PR - 8/18/2009
Well Name/No:HILL RANCH #6-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/18/2009
FacilityID:277394LocationID:308630
County:LAS ANIMAS #071Location:SWSE 6 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8192 ft.
Basin:RATON BASIN  
Planned Location:612FSL  1943 FELLat/Long: 37.020725 / -104.926890Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.020680 / -104.926890Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/18/2009             Measured TD: 2675 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/18/2009
Wellbore Permit
Permit #:20051179 Expiration Date:4/26/2006
Proposed Depth/Form:2625 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/5/2005
Spud Date:5/26/2005Spud Date Is:ACTUAL
Measured TD:2675 ft.Measured PB depth:2482 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL/TLD/GR/CNL/CBL/CCL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 227 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 115, Top: , Bottom: 227 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2637 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 1954 ft., Bottom: 2637 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2123 ft.NN
VERMEJO COAL2123 ft.2404 ft.NN
TRINIDAD2404 ft.2657 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/18/2009                 Interval Top: 2213 ft.    Interval Bottom: 2214 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:11/11/2005Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/6/2009
Treatment Summary:ACIDIZED W/ 1,000 GALS 15% HCI ACID. RE-FRAC'D W/ 63,989 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 6,669# 16/30 BRADY SAND & 111,919# 12/20 BRADY SND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 55
BBLS_OIL 0
BTU_GAS 1026
CALC_BBLS_H2O 110
CALC_BBLS_OIL 0
CALC_MCF_GAS 90
CASING_PRESS 5
MCF_GAS 45
TUBING_PRESS 10
Perforation Data:
Interval Top:2213 ft.# Of Holes:3
Interval Bottom:2214 ft.Hole Size:0.45 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/18/2009                 Interval Top: 562 ft.    Interval Bottom: 2341 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/16/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/16/2009
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2458 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/18/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 118
BTU_GAS 1012
CALC_BBLS_H2O 118
CALC_BBLS_OIL 0
CALC_MCF_GAS 15
CASING_PRESS 56
MCF_GAS 15
TUBING_PRESS 3
Perforation Data:
Interval Top:562 ft.# Of Holes:
Interval Bottom:2341 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/18/2009                 Interval Top: 562 ft.    Interval Bottom: 1429 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/16/2009Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/8/2009
Treatment Summary:ACIDIZED W/ 3,000 GAL 15% HCI ACID. FRAC'D W/127,317 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 23,798# 16/30 BRADY SND & 227,967# 12/20 BRADY SND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:562 ft.# Of Holes:72
Interval Bottom:1429 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)15118
GOR
GOR DeterminationMCFE
Average BOE per Day7.136
Average MCFE per Day41.412

 Federal Financial Assurance  i 

 Tribal Well  i No