Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08366
Well Classification: CBM Status: PR - 2/2/2010
Well Name/No:HILL RANCH #7-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/2/2010
FacilityID:277393LocationID:308629
County:LAS ANIMAS #071Location:SESW 7 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8530 ft.
Basin:RATON BASIN  
Planned Location:661FSL  1888 FWLLat/Long: 37.006365 / -104.931140Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.006410 / -104.931090Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/2/2010             Measured TD: 2900 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/2/2010
Wellbore Permit
Permit #:20051180 Expiration Date:4/26/2006
Proposed Depth/Form:2850 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/5/2005
Spud Date:5/21/2005Spud Date Is:ACTUAL
Measured TD:2900 ft.Measured PB depth:2732 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL / TLD / CNL / GR / CBL / CCL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 625 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 267, Top: 0 ft., Bottom: 625 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2862 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 475, Top: 214 ft., Bottom: 2862 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2260 ft.NN
VERMEJO COAL2357 ft.2658 ft.NN
TRINIDAD2658 ft.2888 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 2/2/2010                  Interval Top: 2377 ft.    Interval Bottom: 2592 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:11/20/2005Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/19/2010
Treatment Summary:ACIDIZED W/2,000 GALS 15% HCL ACID. REFRAC'D W/56,917 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 7,850# 16/30 BRADY SAND & 109,442# 12/20 BRADY SND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 85
BBLS_OIL 0
BTU_GAS 1062
CALC_BBLS_H2O 85
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
CASING_PRESS 5
MCF_GAS 0
TUBING_PRESS 80
Perforation Data:
Interval Top:2377 ft.# Of Holes:44
Interval Bottom:2592 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/2/2010                  Interval Top: 669 ft.    Interval Bottom: 2592 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:2/1/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/5/2005
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2698 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/2/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 102
BTU_GAS 979
CALC_BBLS_H2O 102
CALC_BBLS_OIL 0
CALC_MCF_GAS 8
CASING_PRESS 90
MCF_GAS 8
TUBING_PRESS 4
Perforation Data:
Interval Top:669 ft.# Of Holes:124
Interval Bottom:2592 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/2/2010                  Interval Top: 669 ft.    Interval Bottom: 1680 ft.

 Completed Information for Formation RATON COAL
1st Production Date:2/1/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/19/2010
Treatment Summary:ACIDIZED W/ 4,000 GALS 15% HCI ACID. FRAC'D W/ 198,929 GALS 20# DELTA 140 W/ SANDWEDGE OS CARRYING 31,770# 16/30 BRADY SD & 304,679# 20/20 BRADY SND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:669 ft.# Of Holes:80
Interval Bottom:1680 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)9593
GOR
GOR DeterminationMCFE
Average BOE per Day4.531
Average MCFE per Day26.275

 Federal Financial Assurance  i 

 Tribal Well  i No