|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 2/18/2005 Measured TD: 2250 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 2/18/2005 | | Wellbore Permit | | | Permit #: | 20050601 | Expiration Date: | 3/21/2006 | | Proposed Depth/Form: | 2200 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 8/9/2005 | | Spud Date: | 6/22/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 2250 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | AIL/TLD/CNL/TEMP LOGS/GR/CBL/CCL | | Log Types: | AIL/TLD/CNL/TEMP LOGS/GR/CBL/CCL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 240 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 118, Top: 0 ft., Bottom: 240 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2217 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 2217 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1517 ft. | N | N | | VERMEJO COAL | 1605 ft. | 1930 ft. | N | N | | TRINIDAD | 1930 ft. | 2245 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 9/5/2005 Interval Top: 1651 ft. Interval Bottom: 1922 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/9/2005 | | Treatment Summary: | ACIDIZED W/1500 GAL 15% HCI ACID. FRAC W/145,783 GALS 20# LIGHTNING GEL CARRYING 15,900# 16/30 & 189,100# 12/20 BRADY SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2032 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/5/2005 | Test Method: | | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 53 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 53 | | MCF_GAS | 0 | | TUBING_PRESS | 1 |
| | Perforation Data: | | Interval Top: | 1651 ft. | # Of Holes: | 50 | | Interval Bottom: | 1922 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 31947 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 15.096 |
| Average MCFE per Day | 87.558 |
| Federal Financial Assurance | i | |
|
|