Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08348
Well Classification: GW Status: PR - 6/18/2005
Well Name/No:APACHE CANYON #14-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/18/2005
FacilityID:276542LocationID:308614
County:LAS ANIMAS #071Location:NWSE 14 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8409 ft.
Basin:RATON BASIN  
Planned Location:2180FSL  1949 FELLat/Long: 37.083573 / -104.963132Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.082840 / -104.962470Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/18/2005             Measured TD: 2370 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/18/2005
Wellbore Permit
Permit #:20050603 Expiration Date:3/10/2006
Proposed Depth/Form:2320 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/18/2005
Spud Date:3/22/2005Spud Date Is:ACTUAL
Measured TD:2370 ft.Measured PB depth:2297 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR/CCL/CBL, CNL-TLD, AIL, TEMPERATURE
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 338 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 169, Top: 0 ft., Bottom: 338 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2345 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 2345 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1648 ft.NN
VERMEJO COAL1755 ft.2052 ft.NN
TRINIDAD2052 ft.2355 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/1/2011                  Interval Top: 631 ft.    Interval Bottom: 2025 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:6/18/2005Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/18/2005
Treatment Summary:VRMJO COAL - ACIDIZED W/ 1000 GALS 15% HCL ACID. FRAC'D W/ 111,879 10# DELTA 140 W/ SANDWEDGE NT CARRYING 8786# 16/30 & 194,128# 12/20 BRADY SAND. // RTONS ACIDIZED W/ 2000 GALS 15% HCI ACID. FRAC'D W/ 194,322 GALS 20# DELTA 140 W/ SANDWEDGE NT CARRYING 16,661# 16/30 & 206, 296# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2122 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/18/2005Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 86
CASING_PRESS 4
MCF_GAS 14
TUBING_PRESS 3
Perforation Data:
Interval Top:631 ft.# Of Holes:148
Interval Bottom:2025 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)32328
GOR
GOR DeterminationMCFE
Average BOE per Day15.263
Average MCFE per Day88.540

 Federal Financial Assurance  i 

 Tribal Well  i No