Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08323
Well Classification: CBM Status: PR - 7/14/2011
Well Name/No:HILL RANCH #9-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/14/2011
FacilityID:276188LocationID:308605
County:LAS ANIMAS #071Location:SWSE 9 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8137 ft.
Planned Location:260FSL  2241 FELLat/Long: 37.005235 / -104.891739Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.005170 / -104.891750Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/8/2011
End Date: 6/8/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 313
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/14/2011             Measured TD: 2575 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/14/2011
Wellbore Permit
Permit #:20050251 Expiration Date:2/21/2006
Proposed Depth/Form:2600 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/11/2005
Spud Date:4/18/2005Spud Date Is:ACTUAL
Measured TD:2575 ft.Measured PB depth:2458 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL/CNL/TLD/GR/TEMP/CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 223 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 103, Top: 0 ft., Bottom: 223 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2504 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 382, Top: 214 ft., Bottom: 2504 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2011 ft.NN
TRINIDAD2383 ft.2528 ft.NN
VERMEJO COAL5093 ft.2383 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 7/15/2005                 Interval Top: 2112 ft.    Interval Bottom: 2343 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:PC PMP
Open Hole Completion:No
Formation Treatment
Treatment Date:7/11/2005
Treatment Summary:A. W/1000 GALS 15% HCL AC FRAC'D W/111,511 GALS 20# DELTA 140 SW NT CARRYING 202,914# 16/30 BRADY SD.
Tubing Size:2.875 in.Tubing Setting Depth:2384 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/15/2005Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
CALC_BBLS_H2O 0
CALC_MCF_GAS 200
CASING_PRESS 91
MCF_GAS 200
TUBING_PRESS 4
Perforation Data:
Interval Top:2112 ft.# Of Holes:42
Interval Bottom:2343 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/14/2011                 Interval Top: 456 ft.    Interval Bottom: 2343 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/6/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2367 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/14/2011Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 22
BTU_GAS 1008
CALC_BBLS_H2O 22
CALC_MCF_GAS 94
CASING_PRESS 6
MCF_GAS 94
TUBING_PRESS 5
Perforation Data:
Interval Top:456 ft.# Of Holes:120
Interval Bottom:2343 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/11/2011                 Interval Top: 456 ft.    Interval Bottom: 1422 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/6/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/9/2011
Treatment Summary:Acidized w/3,000 gals 15% HCl acid. Frac'd w/143,770 gals 20# Delta 140 w/Sandwedge OS carrying 255,131# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:456 ft.# Of Holes:78
Interval Bottom:1422 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)22231
GOR
GOR DeterminationMCFE
Average BOE per Day10.499
Average MCFE per Day60.892

 Federal Financial Assurance  i 

 Tribal Well  i No