Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08299
Well Classification: CBM Status: PR - 1/27/2005
Well Name/No:APACHE CANYON #07-06
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/27/2005
FacilityID:275757LocationID:308595
County:LAS ANIMAS #071Location:SENW 7 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8145 ft.
Planned Location:2143FNL  2140 FWLLat/Long: 37.100053 / -104.930361Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.100160 / -104.930450Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 1/5/2005             Measured TD: 2740 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 1/5/2005
Wellbore Permit
Permit #:20050090 Expiration Date:1/26/2006
Proposed Depth/Form:2590 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/1/2005
Spud Date:2/23/2005Spud Date Is:ACTUAL
Measured TD:2740 ft.Measured PB depth:2638 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, AIL, TEMPERATURE LOG
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 403 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 403 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 2685 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 1464 ft., Bottom: 2685 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 0 ft., Bottom: 1450 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1985 ft.NN
VERMEJO COAL2090 ft.2460 ft.NN
TRINIDAD2460 ft.2717 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 5/13/2005                 Interval Top: 2164 ft.    Interval Bottom: 2423 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:2/23/2005Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/1/2005
Treatment Summary:ACIDIZED W/ 500 GALS 15% HCI ACID. FRAC'D W/57,411 GALS 20# DELTA 140 W/ SANDWEDGE NT CARRYING 9200# 16/30 & 91,800# 12/20 SAND ACIDIZED W/500 GALS 15% HCI ACID. FRAC'D W/ 59,299 GALS 20# DELTA 140 W/ SANDWEDGE NT CARRYING 8500# 16/30 & 96,400# 12/20 SAND
Tubing Size:2.875 in.Tubing Setting Depth:2554 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/13/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 136
Perforation Data:
Interval Top:2164 ft.# Of Holes:36
Interval Bottom:2423 ft.Hole Size:0.4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 3/30/2006                 Interval Top: 1000 ft.    Interval Bottom: 1309 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/10/2005Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/1/2005
Treatment Summary:A. W/ 1,500 GALS 15% HCI ACID. FRAC'D W/ 146,645 GALS 20# DELTA 140 W/ SANDWEDGE NT CARRYING 17,500# 16/30 & 258,900# 12/20 BRADY SD.
Tubing Size:2.875 in.Tubing Setting Depth:2535 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/10/2005Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_H2O 142
BBLS_OIL 0
CASING_PRESS 3
MCF_GAS 19
TUBING_PRESS 0
Perforation Data:
Interval Top:1000 ft.# Of Holes:63
Interval Bottom:1309 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 11/17/2005

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/10/2005Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)16095
GOR
GOR DeterminationMCFE
Average BOE per Day7.604
Average MCFE per Day44.090

 Federal Financial Assurance  i 

 Tribal Well  i No