|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/15/2005 Measured TD: 2650 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/15/2005 | | Wellbore Permit | | | Permit #: | 20050089 | Expiration Date: | 1/26/2006 | | Proposed Depth/Form: | 2600 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 7/2/2005 | | Spud Date: | 2/28/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 2650 ft. | Measured PB depth: | 2390 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, TLD/CNL, AIT, TEMP | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 425 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 304, Top: 0 ft., Bottom: 425 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 2606 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 780 ft., Bottom: 2606 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 179, Top: 0 ft., Bottom: 770 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1908 ft. | N | N | | VERMEJO COAL | 2026 ft. | 2382 ft. | N | N | | TRINIDAD | 2382 ft. | 2641 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: AB - 11/10/2005 Interval Top: 2337 ft. Interval Bottom: 2340 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/2/2005 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation VRMJ. |
| | Perforation Data: | | Interval Top: | 2337 ft. | # Of Holes: | | | Interval Bottom: | 2340 ft. | Hole Size: | |
|
Formation RTON Formation Classification: GW Status: PR - 8/15/2005 Interval Top: 1110 ft. Interval Bottom: 1332 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 8/13/2005 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | No | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/2/2005 | | Treatment Summary: | A. W/1000 GALS 15% HCI ACID. FRAC'D W/135,067 20# LIGHTING GEL CARRYING 9080# 16/30 & 161,718# 12/20 ORLEBY NORTAN SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1461 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/15/2005 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 74 | | CALC_BBLS_H2O | 74 | | CALC_MCF_GAS | 29 | | CASING_PRESS | 3 | | MCF_GAS | 29 | | TUBING_PRESS | 4 |
| | Perforation Data: | | Interval Top: | 1110 ft. | # Of Holes: | 40 | | Interval Bottom: | 1332 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 13176 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 6.202 |
| Average MCFE per Day | 35.965 |
| Federal Financial Assurance | i | |
|
|