Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08296
Well Classification: CBM Status: PR - 12/1/2010
Well Name/No:APACHE CANYON #12-03
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2010
FacilityID:275728LocationID:308594
County:LAS ANIMAS #071Location:NENW 12 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8340 ft.
Basin:RATON BASIN  
Planned Location:310FNL  1930 FWLLat/Long: 37.105173 / -104.949171Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.105080 / -104.949170Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 12/1/2010             Measured TD: 2480 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 12/1/2010
Wellbore Permit
Permit #:20050093 Expiration Date:1/24/2006
Proposed Depth/Form:2400 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/28/2005
Spud Date:2/16/2005Spud Date Is:ACTUAL
Measured TD:2480 ft.Measured PB depth:2416 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL/GR/CAL/TLD/CNL/TEMP LOGS/CBL/CCL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 579 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 270, Top: 0 ft., Bottom: 270 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2463 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 1115 ft., Bottom: 2463 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 170, Top: 0 ft., Bottom: 1115 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1748 ft.NN
VERMEJO COAL1968 ft.2210 ft.NN
TRINIDAD2210 ft.2479 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 12/1/2010                 Interval Top: 684 ft.    Interval Bottom: 2193 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/28/2005
Treatment Summary:A. W/ 2,500 GALS 15% HCI AC. FRAC'D W/ 297,174 GALS 20# DELTA 140 W/ SW NT CARRYING 64,416# 16/30 & 295,991# 12/20 BRADY SD.
Tubing Size:2.875 in.Tubing Setting Depth:2304 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/30/2005Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_H2O 149
BTU_GAS 1001
CASING_PRESS 0
MCF_GAS 24
TUBING_PRESS 0
Perforation Data:
Interval Top:684 ft.# Of Holes:27
Interval Bottom:2193 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)20700
GOR
GOR DeterminationMCFE
Average BOE per Day9.768
Average MCFE per Day56.655

 Federal Financial Assurance  i 

 Tribal Well  i No