|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 12/24/2005 Measured TD: 2700 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 12/24/2005 | | Wellbore Permit | | | Permit #: | 20043077 | Expiration Date: | 12/16/2005 | | Proposed Depth/Form: | 2700 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 6/5/2005 | | Spud Date: | 4/21/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 2700 ft. | Measured PB depth: | 1663 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | PLATFORM EXPRESS ARRAY INDUCTION GAMMA RAY, PLATFORM EXPRESS TRIPLE LITHOLOGY DENSITY COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 787 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 787 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1762 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 74 ft., Bottom: 1762 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2179 ft. | N | N | | VERMEJO COAL | 2179 ft. | 2478 ft. | N | N | | TRINIDAD | 2478 ft. | 2700 ft. | N | N |
Formation RTON Formation Classification: GW Status: PR - 7/1/2011 Interval Top: 807 ft. Interval Bottom: 1364 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/5/2005 | | Treatment Summary: | 12/7/05 A. W/1500 GALS HCI AC. FRAC'D W/208,881 GALS 20# DELTA 140 W/ SW NT CARRYING 21,300# 16/30 & 338,300# 12/20 BRADY SD. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1504 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/24/2005 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 89 | | BBLS_OIL | 0 | | BTU_GAS | 992 | | CALC_BBLS_H2O | 89 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 5 | | CASING_PRESS | 17 | | MCF_GAS | 5 | | TUBING_PRESS | 8 |
| | Perforation Data: | | Interval Top: | 807 ft. | # Of Holes: | 43 | | Interval Bottom: | 1364 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 20958 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 9.900 |
| Average MCFE per Day | 57.413 |
| Federal Financial Assurance | i | |
|
|