|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/4/2005 Measured TD: 1850 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/4/2005 | | Wellbore Permit | | | Permit #: | 20043082 | Expiration Date: | 12/13/2005 | | Proposed Depth/Form: | 1800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 5/4/2005 | | Spud Date: | 1/7/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 1850 ft. | Measured PB depth: | 1803 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR/CBL/CCL, AIL, CNL-TLD, TEMPERATURE LOG | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 353 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 165, Top: 0 ft., Bottom: 353 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1849 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 1849 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1850 ft. | N | N |
Formation RTON Formation Classification: GW Status: PR - 7/1/2011 Interval Top: 952 ft. Interval Bottom: 1533 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | No | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/4/2005 | | Treatment Summary: | A. W/500 GALS 15% HC1 ACID. FRAC'D W/40,309 GALS 20# DELTA 140 S/SANDWEDGE NT CARRYHING 15,700# 16/30 & 49,100# 12/20 BRADY SAND. A. W/500 GALS 15% HC1 ACID. FRAC'D W/49,037 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 15,000# CONTINUED NEXT PAGE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1622 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/4/2005 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 147 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 147 | | CALC_MCF_GAS | 69 | | MCF_GAS | 69 |
| | Perforation Data: | | Interval Top: | 952 ft. | # Of Holes: | 60 | | Interval Bottom: | 1533 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 41719 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 19.701 |
| Average MCFE per Day | 114.280 |
| Federal Financial Assurance | i | |
|
|