|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 10/1/2021 Measured TD: 2637 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 10/1/2021 | | Wellbore Permit | | | Permit #: | 20042900 | Expiration Date: | 11/30/2005 | | Proposed Depth/Form: | 2575 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 1/13/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 2637 ft. | Measured PB depth: | 2571 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | AIL/GR/TLD/CSN/CAL, TEMP. LOG, CBL | | Log Types: | GR/CCL/CBL | | Casing: | String Type: SURF, Hole Size: 15 in., Size: 8.625 in., Top: , Depth: 526 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 247, Top: 0 ft., Bottom: 526 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2616 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 470, Top: 0 ft., Bottom: 2616 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1890 ft. | N | N | | VERMEJO COAL | 1998 ft. | 2344 ft. | N | N | | TRINIDAD | 2344 ft. | 2634 ft. | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 10/1/2021 Interval Top: 870 ft. Interval Bottom: 2326 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/22/2005 | | Treatment Summary: | ACIDIZED W/3500 GALS 15% HCL ACID. FRAC'D W/415,043 GALS 203 DELTA 140 W/SANDWEDGE NT CARRYING 123,800# 16/30 & 501,930# 12/20 SD |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2411 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/22/2005 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 94 | | CASING_PRESS | 1 | | MCF_GAS | 26 | | TUBING_PRESS | 0 |
| | Perforation Data: | | Interval Top: | 870 ft. | # Of Holes: | 24 | | Interval Bottom: | 2326 ft. | Hole Size: | 0.4 in. |
|
Formation VRMJ Formation Classification: GW Status: CM - 5/2/2005 Interval Top: 870 ft. Interval Bottom: 2326 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/2/2005 | | Treatment Summary: | SEE SCANNED DOCUMENT #01418302 FOR DETAILS. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2411 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/2/2005 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 94 | | BBLS_OIL | 0 | | BTU_GAS | 1000 | | CALC_GOR | 0 | | CASING_PRESS | 4 | | MCF_GAS | 26 | | TUBING_PRESS | 7 |
| | Perforation Data: | | Interval Top: | 870 ft. | # Of Holes: | 96 | | Interval Bottom: | 2326 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 16288 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 7.701 |
| Average MCFE per Day | 44.672 |
| Federal Financial Assurance | i | |
|
|