Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08248
Well Classification: CBM Status: PR - 5/6/2020
Well Name/No:HILL RANCH #33-4X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/6/2020
FacilityID:274677LocationID:312064
County:LAS ANIMAS #071Location:NWNW 33 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8033 ft.
Basin:RATON BASIN  
Planned Location:525FNL  794 FWLLat/Long: 37.046574 / -104.899449Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.046570 / -104.899450Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/6/2020             Measured TD: 2489 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/6/2020
Wellbore Permit
Permit #:20042750 Expiration Date:11/14/2005
Proposed Depth/Form:2600 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/31/2005
Spud Date:12/7/2004Spud Date Is:ACTUAL
Measured TD:2489 ft.Measured PB depth:2410 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR/CBL/CCL
Casing:String Type: SURF, Hole Size: 15 in., Size: 8.625 in., Top: , Depth: 566 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 247, Top: 0 ft., Bottom: 566 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2452 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 2452 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1960 ft.NN
VERMEJO COAL2040 ft.2358 ft.NN
TRINIDAD2358 ft.2486 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/29/2020                 Interval Top: 2137 ft.    Interval Bottom: 2338 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/31/2005
Treatment Summary:ACIDIZED W/500 GALS 15% HC1 ACID. FRAC'D W/64,373 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 22,700# 16/30 & 86,100# 12/20 SAND. ACIDIZED W/500 GALS 15% HC1 ACID. FRAC'D W/47,300 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 1474# 16/30 & 61,300# 12/20 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 0
CASING_PRESS 4
MCF_GAS 0
TUBING_PRESS 0
Perforation Data:
Interval Top:2137 ft.# Of Holes:24
Interval Bottom:2338 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/6/2020                  Interval Top: 606 ft.    Interval Bottom: 2338 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/14/2018Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:606 ft.# Of Holes:132
Interval Bottom:2338 ft.Hole Size:0.4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 9/14/2018                 Interval Top: 606 ft.    Interval Bottom: 1392 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/4/2018Treatment End Date:9/13/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 1389' - 92' and 1354' - 57', Stage 2 - 1288' - 91', 1282' - 83', 1238' - 42' and 1216' - 19', Stage 3 - 1117' - 20', 1113' - 15; and 1066' - 67', Stage 4 - 904' - 06', 880' - 82', 865' - 68' and 852' - 54', Stage 5 - 656' - 59' and 606' - 607' (36' net or 108 holes). A total of 159,600 gallons of produced water with 88,578 gallons of x-link and 80,692 lbs of 16/30 sand were pumped. All five stages were pumped according to design. The ECWS #28 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton Vermejo well.
Total fluid used in treatment (bbls):5909Max pressure during treatment (psi):3399
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:5
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.38
Recycled water used in treatment (bbls):5909Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):80692Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/14/2018Test Method:Flowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 27
BTU_GAS 996
CALC_BBLS_H2O 27
CALC_MCF_GAS 23
MCF_GAS 23
Perforation Data:
Interval Top:606 ft.# Of Holes:108
Interval Bottom:1392 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)21774
GOR
GOR DeterminationMCFE
Average BOE per Day10.275
Average MCFE per Day59.600

 Federal Financial Assurance  i 

 Tribal Well  i No