Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08116
Well Classification: CBM Status: PR - 8/14/2011
Well Name/No:APACHE CANYON #2-09
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/14/2011
FacilityID:272911LocationID:308490
County:LAS ANIMAS #071Location:NESE 2 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8412 ft.
Planned Location:2529FSL  1143 FELLat/Long: 37.112833 / -104.959732Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.112820 / -104.959730Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/1/2011
End Date: 8/1/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 259
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/14/2011             Measured TD: 2450 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/14/2011
Wellbore Permit
Permit #:Expiration Date:7/7/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/2/2004
Spud Date:7/29/2004Spud Date Is:ACTUAL
Measured TD:2450 ft.Measured PB depth:2379 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL/GR/TLD/CSN/CBL, TEMPERATURE
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 795 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 795 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2424 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 2424 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1761 ft.NN
VERMEJO COAL1833 ft.2192 ft.NN
TRINIDAD2192 ft.2441 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 9/2/2004                  Interval Top: 1842 ft.    Interval Bottom: 2204 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2263 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/2/2004Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 93
CASING_PRESS 0
MCF_GAS 94
TUBING_PRESS 0
Perforation Data:
Interval Top:1842 ft.# Of Holes:52
Interval Bottom:2204 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/14/2011                 Interval Top: 797 ft.    Interval Bottom: 2204 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/13/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2282 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/14/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BTU_GAS 1005
CALC_BBLS_H2O 3
CALC_MCF_GAS 12
CASING_PRESS 4
MCF_GAS 12
TUBING_PRESS 1
Perforation Data:
Interval Top:797 ft.# Of Holes:85
Interval Bottom:2204 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/17/2011                Interval Top: 797 ft.    Interval Bottom: 985 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/13/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/1/2011
Treatment Summary:Acidized w/1,000 gals 15% HCl acid. Frac'd w/47,029 gals 20# Delta 140 w/Sandwedge OS carrying 159,598# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:797 ft.# Of Holes:33
Interval Bottom:985 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)12905
GOR
GOR DeterminationMCFE
Average BOE per Day6.095
Average MCFE per Day35.353

 Federal Financial Assurance  i 

 Tribal Well  i No