Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08101
Well Classification: CBM Status: PR - 5/3/2004
Well Name/No:HILL RANCH #18-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/3/2004
FacilityID:272648LocationID:308479
County:LAS ANIMAS #071Location:NWSE 18 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8446 ft.
Basin:RATON BASIN  
Planned Location:1024FSL  1922 FELLat/Long: 36.996025 / -104.926850Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 36.995560 / -104.926780Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/3/2004             Measured TD: 2775 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/3/2004
Wellbore Permit
Permit #:20041070 Expiration Date:6/16/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/16/2004
Spud Date:7/20/2004Spud Date Is:ACTUAL
Measured TD:2775 ft.Measured PB depth:2705 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 228 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 267, Top: 0 ft., Bottom: 228 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2752 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 2752 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2168 ft.NN
VERMEJO COAL2272 ft.2573 ft.NN
TRINIDAD2573 ft.2760 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 5/3/2004                  Interval Top: 2272 ft.    Interval Bottom: 2509 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:11/16/2004Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/23/2009
Treatment Summary:ACIDIZED W/1,200 GALS 15% HCL ACID. FRAC'D W/53,122 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 8,000# 16/30 BRADY SD & 100,500# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 64
BTU_GAS 1009
CALC_BBLS_H2O 64
CALC_MCF_GAS 59
CASING_PRESS 5
MCF_GAS 59
TUBING_PRESS 3
Perforation Data:
Interval Top:2272 ft.# Of Holes:
Interval Bottom:2509 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/3/2004                  Interval Top: 758 ft.    Interval Bottom: 2509 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/2/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/16/2004
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2597 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 214
BBLS_OIL 0
BTU_GAS 1008
CALC_BBLS_H2O 214
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 106
CASING_PRESS 87
MCF_GAS 106
TUBING_PRESS 7
Perforation Data:
Interval Top:758 ft.# Of Holes:
Interval Bottom:2509 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 5/3/2004                  Interval Top: 758 ft.    Interval Bottom: 1732 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/2/2009Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/24/2009
Treatment Summary:ACIDIZED W/4,450 GALS 15% HCL ACID. FRAC'D W/176,963 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 31,900# 16/30 BRADY SD & 320,000# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:758 ft.# Of Holes:90
Interval Bottom:1732 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)22809
GOR
GOR DeterminationMCFE
Average BOE per Day10.775
Average MCFE per Day62.490

 Federal Financial Assurance  i 

 Tribal Well  i No