Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08080
Well Classification: CBM Status: PR - 11/17/2009
Well Name/No:HILL RANCH #05-07
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/17/2009
FacilityID:272458LocationID:308465
County:LAS ANIMAS #071Location:SWNE 5 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8149 ft.
Basin:RATON BASIN  
Planned Location:2363FNL  1783 FELLat/Long: 37.027045 / -104.908259Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.027030 / -104.908300Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 11/17/2009             Measured TD: 2700 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 11/17/2009
Wellbore Permit
Permit #:20041068 Expiration Date:5/26/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/8/2005
Spud Date:7/15/2004Spud Date Is:ACTUAL
Measured TD:2700 ft.Measured PB depth:2611 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, TEMP, AIL, TLD/CNL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 622 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 267, Top: 0 ft., Bottom: 622 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2675 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 440, Top: 0 ft., Bottom: 2675 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2085 ft.NN
VERMEJO COAL2151 ft.2454 ft.NN
TRINIDAD2454 ft.2689 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 12/14/2010                Interval Top: 2196 ft.    Interval Bottom: 2436 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/8/2005
Treatment Summary:ACIDIZED W/1500 GALS 15% HCI ACID. FRAC'D W/157,140 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 19,500# 16/30 & 198,600# 12/20 BRADY SAND
Tubing Size:2.875 in.Tubing Setting Depth:2516 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/8/2005Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 96
CALC_BBLS_H2O 96
CALC_MCF_GAS 287
CASING_PRESS 18
MCF_GAS 287
TUBING_PRESS 3
Perforation Data:
Interval Top:2196 ft.# Of Holes:60
Interval Bottom:2436 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 11/17/2009                Interval Top: 652 ft.    Interval Bottom: 2436 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/12/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/8/2005
Treatment Summary:
Tubing Size:Tubing Setting Depth:2524 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/17/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 70
BBLS_OIL 0
BTU_GAS 1009
CALC_BBLS_H2O 70
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 307
CASING_PRESS 6
MCF_GAS 307
TUBING_PRESS 4
Perforation Data:
Interval Top:652 ft.# Of Holes:
Interval Bottom:2436 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 6/17/2011                 Interval Top: 652 ft.    Interval Bottom: 1467 ft.

 Completed Information for Formation RATON COAL
1st Production Date:11/12/2009Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/5/2009
Treatment Summary:ACIDZIED W/ 4,000 GALS 15% HCI ACID, FRAC'D W/174,469 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 26,110# 16/30 BRADT SD & 324,699# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:652 ft.# Of Holes:103
Interval Bottom:1467 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)42558
GOR
GOR DeterminationMCFE
Average BOE per Day20.101
Average MCFE per Day116.592

 Federal Financial Assurance  i 

 Tribal Well  i No