Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08079
Well Classification: CBM Status: PR - 4/25/2010
Well Name/No:HILL RANCH #17-05
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/25/2010
FacilityID:272459LocationID:308464
County:LAS ANIMAS #071Location:SWNW 17 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8250 ft.
Basin:RATON BASIN  
Planned Location:2092FNL  78 FWLLat/Long: 36.998795 / -104.919950Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 36.998800 / -104.919970Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 4/25/2010             Measured TD: 2700 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 4/25/2010
Wellbore Permit
Permit #:20041069 Expiration Date:5/26/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/9/2004
Spud Date:7/17/2004Spud Date Is:ACTUAL
Measured TD:2700 ft.Measured PB depth:2587 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL , TLD / CSN & CBL, TEMPERATURE, RESERVOIR SATURATION.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 339 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 148, Top: 0 ft., Bottom: 339 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2632 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 473, Top: 90 ft., Bottom: 2632 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2050 ft.NN
VERMEJO COAL2114 ft.2416 ft.NN
TRINIDAD2416 ft.2700 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/25/2010                 Interval Top: 2128 ft.    Interval Bottom: 2365 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:11/9/2004Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/6/2010
Treatment Summary:ACIDIZED WITH 1300 15% HCI ACID. REFRACD WITH 65463 GALS 20# DELTA 140 SANDWEDGE OS CARRYING 7488# 16/30 BRADY SD AND 141294# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 88
CALC_BBLS_H2O 88
CALC_MCF_GAS 23
CASING_PRESS 54
MCF_GAS 23
TUBING_PRESS 5
Perforation Data:
Interval Top:2128 ft.# Of Holes:32
Interval Bottom:2365 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 4/25/2010                 Interval Top: 576 ft.    Interval Bottom: 2365 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:4/24/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/6/2010
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2485 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/25/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 113
BTU_GAS 986
CALC_BBLS_H2O 113
CALC_MCF_GAS 333
CASING_PRESS 5
MCF_GAS 333
TUBING_PRESS 4
Perforation Data:
Interval Top:576 ft.# Of Holes:134
Interval Bottom:2365 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 4/25/2010                 Interval Top: 576 ft.    Interval Bottom: 1443 ft.

 Completed Information for Formation RATON COAL
1st Production Date:4/24/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/7/2010
Treatment Summary:ACIDIZED WITH 4900 GALS 15% HCI ACID. FRACD WITH 127874 GALS 20# DELTA 140 WITH SANDWEDGE OS CARRYING 32092# 16/30 BRADY SD AND 377130# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:576 ft.# Of Holes:102
Interval Bottom:1443 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)31483
GOR
GOR DeterminationMCFE
Average BOE per Day14.863
Average MCFE per Day86.225

 Federal Financial Assurance  i 

 Tribal Well  i No