Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08065
Well Classification: CBM Status: PR - 3/5/2007
Well Name/No:HILL RANCH #7-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/5/2007
FacilityID:272337LocationID:308455
County:LAS ANIMAS #071Location:NESE 7 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8254 ft.
Basin:RATON BASIN  
Planned Location:2300FSL  927 FELLat/Long: 37.010865 / -104.923400Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.010850 / -104.923370Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 3/5/2007             Measured TD: 2650 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 3/5/2007
Wellbore Permit
Permit #:Expiration Date:5/20/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/15/2004
Spud Date:6/13/2004Spud Date Is:ACTUAL
Measured TD:2650 ft.Measured PB depth:2620 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL , TLD / CSN / DTL , GR / CBL, TEMPERATURE
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 344 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 0 ft., Bottom: 344 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2620 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 422, Top: 56 ft., Bottom: 2620 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2085 ft.NN
VERMEJO COAL2160 ft.2445 ft.NN
TRINIDAD2445 ft.2645 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 3/5/2007                  Interval Top: 2161 ft.    Interval Bottom: 2383 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/15/2004Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/12/2010
Treatment Summary:ACIDIZED WITH 2000 GALS 15% HCI ACID. REFRACD WITH 135311 GALS 20# DELTA 140 WITH SANDWEDGE OS CARRYING 16627# 16/30 BRADY SD & 232188# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 110
CALC_BBLS_H2O 110
CALC_MCF_GAS 38
CASING_PRESS 56
MCF_GAS 38
TUBING_PRESS 4
Perforation Data:
Interval Top:2161 ft.# Of Holes:52
Interval Bottom:2383 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 1/26/2010                 Interval Top: 496 ft.    Interval Bottom: 2383 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:1/23/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/15/2004
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2488 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/26/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 128
BTU_GAS 999
CALC_BBLS_H2O 128
CALC_MCF_GAS 9
CASING_PRESS 95
MCF_GAS 9
TUBING_PRESS 3
Perforation Data:
Interval Top:496 ft.# Of Holes:130
Interval Bottom:2383 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 3/5/2007                  Interval Top: 496 ft.    Interval Bottom: 1452 ft.

 Completed Information for Formation RATON COAL
1st Production Date:1/23/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/15/2010
Treatment Summary:ACIDIZED WITH 3000 GALS 15% HCI ACID. FRACD WITH 163999 GALS 20# DELTA 140 WITH SANDWEDGE OS CARRYING 17833# 16/30 BRADY SD & 256152# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:496 ft.# Of Holes:78
Interval Bottom:1452 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)28739
GOR
GOR DeterminationMCFE
Average BOE per Day13.576
Average MCFE per Day78.738

 Federal Financial Assurance  i 

 Tribal Well  i No