Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08065
Well Classification: CBM Status: PR - 3/5/2007
Well Name/No:HILL RANCH #7-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/5/2007
FacilityID:272337LocationID:308455
County:LAS ANIMAS #071Location:NESE 7 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8254 ft.
Basin:RATON BASIN  
Planned Location:2300FSL  927 FELLat/Long: 37.010865 / -104.923400Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.010850 / -104.923370Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 3/5/2007             Measured TD: 2650 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 3/5/2007
Wellbore Permit
Permit #:Expiration Date:5/20/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/15/2004
Spud Date:6/13/2004Spud Date Is:ACTUAL
Measured TD:2650 ft.Measured PB depth:2620 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL , TLD / CSN / DTL , GR / CBL, TEMPERATURE
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 344 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 0 ft., Bottom: 344 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2620 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 422, Top: 56 ft., Bottom: 2620 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2085 ft.NN
VERMEJO COAL2160 ft.2445 ft.NN
TRINIDAD2445 ft.2645 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 3/5/2007                  Interval Top: 2161 ft.    Interval Bottom: 2383 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/15/2004Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/12/2010
Treatment Summary:ACIDIZED WITH 2000 GALS 15% HCI ACID. REFRACD WITH 135311 GALS 20# DELTA 140 WITH SANDWEDGE OS CARRYING 16627# 16/30 BRADY SD & 232188# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 110
CALC_BBLS_H2O 110
CALC_MCF_GAS 38
CASING_PRESS 56
MCF_GAS 38
TUBING_PRESS 4
Perforation Data:
Interval Top:2161 ft.# Of Holes:52
Interval Bottom:2383 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 1/26/2010                 Interval Top: 496 ft.    Interval Bottom: 2383 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:1/23/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/15/2004
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2488 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/26/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 128
BTU_GAS 999
CALC_BBLS_H2O 128
CALC_MCF_GAS 9
CASING_PRESS 95
MCF_GAS 9
TUBING_PRESS 3
Perforation Data:
Interval Top:496 ft.# Of Holes:130
Interval Bottom:2383 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 3/5/2007                  Interval Top: 496 ft.    Interval Bottom: 1452 ft.

 Completed Information for Formation RATON COAL
1st Production Date:1/23/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/15/2010
Treatment Summary:ACIDIZED WITH 3000 GALS 15% HCI ACID. FRACD WITH 163999 GALS 20# DELTA 140 WITH SANDWEDGE OS CARRYING 17833# 16/30 BRADY SD & 256152# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:496 ft.# Of Holes:78
Interval Bottom:1452 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)28576
GOR
GOR DeterminationMCFE
Average BOE per Day13.501
Average MCFE per Day78.289

 Federal Financial Assurance  i 

 Tribal Well  i No