Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-08064
Well Classification: CBM Status: PR - 10/31/2007
Well Name/No:HILL RANCH #1-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/31/2007
FacilityID:272339LocationID:308454
County:LAS ANIMAS #071Location:SESE 1 35S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8546 ft.
Planned Location:1028FSL  922 FELLat/Long: 37.021854 / -104.940780Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.021860 / -104.940740Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/31/2007             Measured TD: 2700 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/31/2007
Wellbore Permit
Permit #:20040923 Expiration Date:5/20/2005
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/22/2004
Spud Date:7/7/2004Spud Date Is:ACTUAL
Measured TD:2700 ft.Measured PB depth:2607 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIL/TLD/CSN & GR/CBL, TEMPERATURE LOG
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 409 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 203, Top: 0 ft., Bottom: 109 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2676 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 502, Top: 0 ft., Bottom: 2676 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 7 in., Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1964 ft.NN
VERMEJO COAL2046 ft.2357 ft.NN
TRINIDAD2357 ft.2691 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/31/2007                Interval Top: 2317 ft.    Interval Bottom: 2604 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/22/2004Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/7/2004
Treatment Summary:ACIDIZED W/1500 GALS 15% HCL ACID. FRAC'D W/158,311 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 58,500# 16/30 AND 159,500 # 12/20 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/23/2004Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 135
CALC_BBLS_H2O 135
CALC_MCF_GAS 0
CASING_PRESS 2
MCF_GAS 0
TUBING_PRESS 38
Perforation Data:
Interval Top:2317 ft.# Of Holes:48
Interval Bottom:2604 ft.Hole Size:0.4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 12/7/2006                 Interval Top: 470 ft.    Interval Bottom: 1370 ft.

 Completed Information for Formation RATON COAL
1st Production Date:12/6/2006Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/13/2006
Treatment Summary:ACIDIZED W/2250 GALS 15% HCL ACID. FRAC'D W/152,438 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 16,600# 16/30 BRADY SAND AND 327,213# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1472 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/7/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 90
BTU_GAS 998
CALC_BBLS_H2O 90
CALC_MCF_GAS 1
CASING_PRESS 1
GRAVITY_OIL 1
MCF_GAS 1
TUBING_PRESS 4
Perforation Data:
Interval Top:470 ft.# Of Holes:60
Interval Bottom:1370 ft.Hole Size:0.45 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 12/7/2006

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:12/7/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)7124
GOR
GOR DeterminationMCFE
Average BOE per Day3.361
Average MCFE per Day19.480

 Federal Financial Assurance  i 

 Tribal Well  i No